![Logo](https://pvu.thebluebook.com/inc/img/qp/1661397/derr-enterprises-construction-services-llc-logo1.png?quality=90&width=120&height=120&mode=pad)
Featured Project Return to Projects List
Grease Tank Restoration
Project Information
- Project Location:
- Hazleton, PA
- Status:
- Completed - Nov 2016
- Structure Type:
- Sewage / Water Treatment Plant
References
- Owner:
- Greater Hazleton Joint Sewer Authority
Scope Of Work
Restoration of a 105,000 gallon grease holding tank. We installed scaffolding on the entire interior. We had to chip out the defective and deteriorating concrete from the beams and side walls. Then we sandblasted the walls and beams to remove the failed coatings and to profile the concrete. Then we patched the walls and sprayed two coats of epoxy on the same. Clean out the interior of the sand and concrete debris, removed the scaffolding and reinstalled the fiberglass lid panels and trims and reinstalled hand rails. Products used are Pavemend VR and Aquafin VaporTight Coat SG-3.