Airside Technology Corp.

East Syracuse, NY 13057

Company Info

  • Est. 1984
  • Size 50-99 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Airside Technology Corporation was established in 1984 and is a locally owned and operated full service HVAC contractor. The company's expertise includes all aspects of HVAC Service - controls, pipe fitting, and sheet metal work, and specializes in both commercial and industrial HVAC Service Contracting and Sheet Metal Fabrication.

Airside Technology Corporation has a diverse customer base that is comprised of Commercial, Industrial, Institutional, Municipal, Retail, and Office Building projects.

The company focuses on providing prompt service and utilizing advanced technology with its sheet metal fabrication services. This includes PC controlled fabrication equipment that can produce rectangular duct on demand for "fast-track" projects, and plasma technology that allows Airside Technology to produce precision duct fittings that further increases the fabrication shops productivity.

What We Do

Regions & Counties Serviced

  • New York - Upstate

New York 1

  • Onondaga

Our CSI Codes

13 50 00.00.01 - Special Instrumentation
22 01 60 - Operation and Maintenance of Laboratory and Healthcare Systems
22 06 60 - Schedules for Laboratory and Healthcare Systems
22 11 13 - Facility Water Distribution Piping
22 15 13 - General Service Compressed-Air Piping
22 60 00.00.01 - Gas and Vacuum Systems for Laboratory and Healthcare Facilities
22 61 13 - Compressed-Air Piping for Laboratory and Healthcare Facilities
22 61 13.53 - Laboratory Compressed-Air Piping
22 61 13.70 - Healthcare Compressed-Air Piping
22 61 13.74 - Dental Compressed-Air Piping
22 61 19.70 - Healthcare Compressed-Air Equipment
22 62 13 - Vacuum Piping for Laboratory and Healthcare Facilities
22 62 13.53 - Laboratory Vacuum Piping
22 62 13.70 - Healthcare, Surgical Vacuum Piping
22 62 13.74 - Dental Vacuum Piping
22 62 23 - Waste Anesthesia-Gas Piping
22 63 13 - Gas Piping for Laboratory and Healthcare Facilities
22 63 13.53 - Laboratory Gas Piping
22 63 13.70 - Healthcare Gas Piping
22 66 53 - Laboratory Chemical-Waste and Vent Piping
22 66 70 - Healthcare Chemical-Waste and Vent Piping
22 66 83 - Chemical-Waste Tanks
22 67 13 - Processed Water Piping for Laboratory and Healthcare Facilities
22 67 13.13 - Distilled-Water Piping
23 01 30 - Operation and Maintenance of HVAC Air Distribution
23 01 50 - Operation and Maintenance of Central Heating Equipment
23 01 60 - Operation and Maintenance of Central Cooling Equipment
23 01 70 - Operation and Maintenance of Central HVAC Equipment
23 06 10 - Schedules for Facility Fuel Service Systems
23 06 30 - Schedules for HVAC Air Distribution
23 06 30.13 - HVAC Fan Schedule
23 06 30.16 - Air Terminal Unit Schedule
23 06 30.19 - Air Outlet and Inlet Schedule
23 06 50 - Schedules for Central Heating Equipment
23 06 70 - Schedules for Central HVAC Equipment
23 06 70.13 - Indoor, Central-Station Air-Handling Unit Schedule
23 06 70.16 - Packaged Outdoor HVAC Equipment Schedule
23 06 80 - Schedules for Decentralized HVAC Equipment
23 06 80.13 - Decentralized Unitary HVAC Equipment Schedule
23 09 13 - Instrumentation and Control Devices for HVAC
23 09 13.13 - Actuators and Operators
23 09 13.23 - Sensors and Transmitters
23 09 23 - Direct-Digital Control System for HVAC
23 09 33 - Electric and Electronic Control System for HVAC
23 09 43 - Pneumatic Control System for HVAC
23 09 53 - Pneumatic and Electric Control System for HVAC
23 09 93 - Sequence of Operations for HVAC Controls
23 10 00.00.01 - Facility Fuel Systems
23 11 13 - Facility Fuel-Oil Piping
23 11 23 - Facility Natural-Gas Piping
23 21 13.23 - Aboveground Hydronic Piping
23 22 13 - Steam and Condensate Heating Piping
23 22 13.23 - Aboveground Steam and Condensate Heating Piping
23 24 16 - Internal-Combustion Engine Exhaust Piping
23 30 00.00.01 - HVAC Air Distribution
23 31 13.16 - Round and Flat-Oval Spiral Ducts
23 32 13 - Fabricated, Metal Air Plenums
23 32 36 - Air-Distribution Floor Plenums
23 32 39 - Air-Distribution Wall Plenums
23 32 43 - Air-Distribution Chases Formed by General Construction
23 34 13 - Axial HVAC Fans
23 34 16 - Centrifugal HVAC Fans
23 34 23 - HVAC Power Ventilators
23 35 16 - Engine Exhaust Systems
23 35 16.13 - Positive-Pressure Engine Exhaust Systems
23 35 16.16 - Mechanical Engine Exhaust Systems
23 37 16 - Fabric Air Distribution Devices
23 38 13 - Commercial-Kitchen Hoods
23 38 13.13 - Listed Commercial-Kitchen Hoods
23 38 13.16 - Standard Commercial-Kitchen Hoods
23 38 16 - Fume Hoods
23 41 43 - Ultra-Low Penetration Filtration
23 41 46 - Super Ultra-Low Penetration Filtration
23 43 13 - Washable Electronic Air Cleaners
23 43 16 - Agglomerator Electronic Air Cleaners
23 43 23 - Self-Contained Electronic Air Cleaners
23 51 13.13 - Draft-Induction Fans
23 51 43 - Flue-Gas Filtration Equipment
23 51 43.13 - Gaseous Filtration
23 65 13 - Forced-Draft Cooling Towers
23 65 13.13 - Open-Circuit, Forced-Draft Cooling Towers
23 65 13.16 - Closed-Circuit, Forced-Draft Cooling Towers
23 65 16 - Natural-Draft Cooling Towers
23 65 23 - Field-Erected Cooling Towers
25 01 10 - Operation and Maintenance of Integrated Automation Network Equipment
25 01 20 - Operation and Maintenance of Integrated Equipment
25 01 30 - Operation and Maintenance of Integrated Automation Instrumentation and Terminal Devices
25 01 90 - Diagnostic Systems for Integrated Automation
25 05 53 - Identification for Integrated Automation
25 06 11 - Schedules for Integrated Automation Network
25 06 12 - Schedules for Integrated Automation Network Gateways
25 06 13 - Schedules for Integrated Automation Control and Monitoring Network
25 06 14 - Schedules for Integrated Automation Local Control Units
25 06 30 - Schedules for Integrated Automation Instrumentation and Terminal Devices
25 30 00.00.01 - Integrated Automation Instrumentation and Terminal Devices
25 31 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Facility Equipment
25 35 19 - Integrated Automation Control Valves
25 35 26 - Integrated Automation Compressed Air Supply
25 36 19 - Integrated Automation Current Sensors
25 38 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Electronic Safety and Security Systems
25 51 00.00.01 - Integrated Automation Control of Facility Equipment
25 55 00.00.01 - Integrated Automation Control of HVAC
25 56 00.00.01 - Integrated Automation Control of Electrical Systems
25 90 00.00.01 - Integrated Automation Control Sequences
25 91 00.00.01 - Integrated Automation Control Sequences for Facility Equipment
25 95 00.00.01 - Integrated Automation Control Sequences for HVAC
25 96 00.00.01 - Integrated Automation Control Sequences for Electrical Systems
26 09 23 - Lighting Control Devices
26 09 36 - Modular Dimming Controls
26 09 36.13 - Manual Modular Dimming Controls
26 09 36.16 - Integrated Multipreset Modular Dimming Controls
26 09 43 - Network Lighting Controls
26 09 43.13 - Digital-Network Lighting Controls
26 09 43.16 - Addressable Fixture Lighting Control
26 24 19 - Motor-Control Centers
33 81 33 - Communications Blowers, Fans, and Ventilation
34 43 26.13 - Airfield Lighting Control Equipment
34 43 26.16 - Airfield Lighting PLC Control Equipment
40 01 10 - Operation and Maintenance of Gas and Vapor Process Piping
40 01 20 - Operation and Maintenance of Liquids Process Piping
40 01 40 - Operation and Maintenance of Process Piping and Equipment Protection
40 05 13 - Common Work Results for Process Piping
40 05 13.13 - Steel Process Piping
40 05 13.16 - Lined or Internally-Coated Steel Process Piping
40 05 13.19 - Stainless-Steel Process Piping
40 05 13.23 - Aluminum Alloys Process Piping
40 05 13.33 - Brass, Bronze, Copper, and Copper Alloys Process Piping
40 05 13.43 - Nickel and Nickel Alloys Process Piping
40 05 13.53 - Ductile, Malleable, and Cast Iron Alloys Process Piping
40 05 13.63 - Titanium and Titanium Alloys Process Piping
40 05 13.73 - Plastic Process Piping
40 05 13.76 - Fiberglass-Reinforced Plastic and Resins Process Piping
40 05 13.93 - Other Metals Process Piping
40 06 10 - Schedules for Gas and Vapor Process Piping
40 06 20 - Schedules for Liquids Process Piping
40 06 30 - Schedules for Solid and Mixed Materials Piping and Chutes
40 06 40 - Schedules for Process Piping and Equipment Protection
40 10 00.00.01 - Gas and Vapor Process Piping
40 11 13 - Low-Pressure Steam Process Piping
40 11 16 - Intermediate-Pressure Steam Process Piping
40 11 19 - High-Pressure Steam Process Piping
40 11 23 - Condensate Process Piping
40 12 13 - Breathing Compressed Air Process Piping
40 12 16 - Non-Breathing Compressed Air Process Piping
40 13 13 - Argon Process Piping
40 13 16 - Carbon-Dioxide Process Piping
40 13 19 - Helium Process Piping
40 13 23 - Krypton Process Piping
40 13 26 - Neon Process Piping
40 13 29 - Nitrogen Process Piping
40 13 33 - Xenon Process Piping
40 13 93 - Mixed Inert Gases Process Piping
40 14 16 - Blue (Water) Fuel Gas Piping
40 14 19 - Butane Piping
40 14 23 - Carbon-Monoxide Piping
40 14 26 - Chlorine Fuel Gas Piping
40 14 33 - Ethane-Gas Piping
40 14 36 - Hydrogen Fuel Gas Piping
40 14 39 - Liquid Natural-Gas Process Piping
40 14 43 - Methylacetylene-Propadiene Fuel Gas Piping
40 14 49 - Natural-Gas Process Piping
40 14 49.13 - Synthetic Natural-Gas Piping
40 14 49.23 - Propane-Air Mixes Fuel Gas Piping
40 14 53 - Octane Fuel Gas Piping
40 14 59 - Propane Fuel Gas Process Piping
40 14 63 - Sewage Fuel Gas Piping
40 14 93 - Mixed Fuel Gases Piping
40 15 13 - Combustion Air Piping
40 15 16 - Oxygen Combustion System Gas Piping
40 15 23 - Exothermic-Gas Combustion System Piping
40 15 26 - Endothermic-Gas Combustion System Piping
40 15 29 - Disassociated-Ammonia-Gas Combustion System Piping
40 16 13 - Ammonia Gas Piping
40 16 16 - Boron Gas Piping
40 16 26 - Diborane Gas Piping
40 16 29 - Fluorine Gas Piping
40 16 33 - Hydrogen Sulfide Gas Piping
40 16 36 - Nitrous-Oxide Gas Process Piping
40 16 39 - Ozone Gas Piping
40 16 43 - Phosphine Gas Piping
40 16 46 - Silane Gas Piping
40 16 49 - Sulfur-Dioxide Gas Piping
40 16 53 - Specialty Gas Mixtures Piping
40 18 13 - Low-Vacuum Systems Process Piping
40 18 16 - High-Vacuum Systems Process Piping
40 20 00.00.01 - Liquids Process Piping
40 21 13 - Bio Fuels Process Piping
40 22 16 - Light-Fractions Petroleum Products Piping
40 23 13 - De-Ionized Water Process Piping
40 23 16 - Distilled-Water Process Piping
40 23 19 - Process Plant Water Piping
40 23 23 - Potable Water Process Piping
40 23 29 - Recirculated Water Process Piping
40 23 33 - Reverse-Osmosis Water Process Piping
40 24 13 - Alcohol Piping
40 24 16 - Gel Piping
40 24 19 - Slurries Process Piping
40 24 23 - Thixotropic Liquid Piping
40 25 13 - Liquid Acids Piping
40 25 16 - Liquid Bases Piping
40 26 00.00.01 - Liquid Polymer Piping
40 90 00.00.01 - Instrumentation and Control for Process Systems
40 92 49 - Variable Frequency Drives
40 94 23 - Distributed Process Control Systems
40 94 43 - Programmable Logic Process Controllers
42 01 20 - Operation and Maintenance of Process Cooling Equipment
42 06 20 - Schedules for Process Cooling Equipment
42 21 13 - Open-Circuit Process Cooling Towers
42 21 16 - Closed-Circuit Process Cooling Towers
43 11 13 - Gas Handling Fans
43 11 13.13 - Axial Gas Handling Fans
43 11 13.16 - Centrifugal Gas Handling Fans
43 11 23 - Gas Handling Blowers

Project Experience

  • Private
  • Service Work/Repairs

Gallery

Featured Image 1
Services
Featured Image 2
Services
Featured Image 3
Services
Featured Image 4
Services
Share URL copied!
https://www.thebluebook.com/iProView/1081863/airside-technology-corp/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.