Logo

Yates Construction

Share

Fort Worth, TX 76137

Company Info

  • Est. 1964
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Nissan Assembly Plant

Project Information

Project Location:
Canton, MS
Status:
Completed
Structure Type:
Manufacturing Plant

Scope Of Work

Yates Construction and  our joint venture partner provided construction s for Mississippi’s first automotive manufacturing facility. This two phase project totaling 3.3 million SF consists of three buildings that perform metal parts stamping, robotic welding of the entire sheet metal body, and then final vehicle assembly. In total, 18,000 tons of structural steel, 90,000 cubic yards of reinforced concrete, 18,000 tons of air conditioning, and 2 million linear feet of electrical conductor were installed. The project’s scope also included equipment pits, a primary switch gear, a water tank, utility trestles, a process tank farm, and caisson foundations for all presses and production conveyors.

Share URL copied!
https://www.thebluebook.com/iProView/1127771/yates-construction/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.