W.M. Lyles Co.
Rocklin, CA 95765
Featured Project Return to Projects List
LADWP, Silver Lake Reservoir Complete Storage Replacement Project
Project Information
- Project Location:
- Los Angeles, CA
- Approx Contract:
- $300,000,000
- Status:
- Completed - Dec 2020
- Structure Type:
- Sewage / Water Treatment Plant
Scope Of Work
Phase 1
W. M. Lyles Co. has teamed with Webcor Builders and Obayashi Corporation to form Webcor, Obayashi, Lyles, (WOL) a Joint Venture CMAR for the Silverlake Complex Storage Replacement Project. WOL provides construction services and design support for LADWP to meet Federal Water Quality Regulations by con-structing two underground reservoirs and a 96’’ diameter pipeline which will re-place the operational function of the existing Silverlake and Ivanhoe reservoirs. Phase 1 of the project consists of the construction of a 55 million gallon concrete reservoir, connecting piping and a 3,000 foot long 12 foot diameter tunnel.
Phase 2
Phase 2 consists of the construction of a 60 million gallon concrete reservoir, inlet and outlet piping and installation of 840 lf of 78” diameter steel pipeline.