Featured Project Return to Projects List
Rail Project
Project Information
- Project Location:
- Los Angeles, CA
- Approx Contract:
- $109
- Status:
- Completed - Jul 2004
- Structure Type:
- Misc Project
References
- Owner:
- Los Angeles County Metropolitan
- Architect:
- General Contractor:
- Balfour Beatty Infrastructure, Inc.
Scope Of Work
Metro Gold Line East Side Extension
Balfour Beatty Rail completed the Metro Gold Line East Side Extension in 2008 in a joint venture with Steiny and Company, a Los Angeles-based electrical contractor. Balfour Beatty Rail designed, installed and tested all system components; including signaling, communications, traction power and the overhead catenary system.
The project began at the southern limit of the Los Angeles Union Station, which at the time of the contract was the last Metro Gold Line station. It continued on at-grade for about 1.5 miles. The underground segment of the project involved construction of two double-level underground stations and the installation of the double track.