Logo

Metco Engineering

Dallas, TX 75219

Company Info

  • Est. 2004
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

North East Police Station Power Upgrade

Project Information

Project Location:
Dallas, TX
Approx Contract:
$200,000
Status:
Completed
Structure Type:
Fire / Police Station

Scope Of Work

The solar PV panels were mounted on the rooftop without battery or a generator backup. No battery backup means that the system will not go through the hassle of charging, which reduces efficiency by 10%. This type of configuration is widely known as the grid-tied or utility-connected system. These produce the same Alternating Current (AC) that is produced by the main transmission. This also means that when these solar PV systems are not in operation, for example at night, the grid takes over to supply power to the building. This way, the transmission acts as a virtual battery for the solar PV systems.

By the end of the project timeline, we had the solar modules supplying clean energy with long lasting benefits for the company.

Share URL copied!
https://www.thebluebook.com/iProView/1221057/metco-engineering/engineers/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.