G & M Associates

Share

College Grove, TN 37046

Company Info

  • Est. 1999
  • Annual Vol $3 million - $6 million

Featured Project Return to Projects List

TN Air National Guard - Construct Day Gate in Base Supply Weapons Vault Bldg 720

Project Information

Project Location:
Nashville, TN
Status:
Completed
Structure Type:
Government

Scope Of Work

 Removal of three folding day gates, a solid double door. Installation of three new folding day gates, one pass through security day gate, a solid metal double door with panic hardware and personnel notification system. Gates shall be galvanized with heavy-duty steel U-channel webbing , riveted back to back with aircraft quality rivets with heavy duty 1-1/2″ x1-1/2″ vertical member angles, solid steel casters and constructed of strong 3/4″ steel channel.  Gate shall have baked architectural brown finish for a longer life. Zinc-plated rivets to prevent corrosion. Complete with smooth rolling wheels and padlock lug. Double gates shall have a cane bolt that holds left half in position, or both halves may be opened for full access. Gates shall fold completely and swing a full 180 degrees for an unobstructed clear opening .  Provide exterior solid steel door and frame to replace existing, complying with ANSI A250.8

Share URL copied!
https://www.thebluebook.com/iProView/1267866/g-m-associates/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.