ACE Services, Inc.
Columbia, MD 21046
Featured Project Return to Projects List
East West WWTP
Project Information
- Project Location:
- Beltsville, MD
- Approx Contract:
- $5,000,000
- Status:
- In-Progress
- Structure Type:
- Sewage / Water Treatment Plant
References
- Owner:
- USDA
- Architect:
- ARRO Consulting
Scope Of Work
The following is a general description of the project:
The work under this contract is divided into 2 areas which have been consolidated into one contract.
Work at the East WWTP includes:
Upgrades to the 300-gpm Overland Flow and 850-gpm Influent Pumping Systems
Installation of a 1.21 MGD grit removal system
Modification of three (3) 620,000-gallon basins within the existing secondary treatment system for Enhanced Nutrient Removal (ENR)
Installation of two (2) chemical storage (1,050 gallons each) and feed systems
Minor electrical
Concrete and site repairs/improvements.
Work at the West WWTP includes:
Rehabilitation of an existing Evoqua/DAVCO treatment train
Installation of a chemical storage (550 gallon) and feed system
Minor electrical
Minor concrete repairs