![Logo](https://pvu.thebluebook.com/inc/img/qp/2163565/green-earth-heavy-hauling-llc-logo.png?quality=90&width=120&height=120&mode=pad)
Featured Project Return to Projects List
Parker NW Spillway Project
Project Information
- Project Location:
- Canby, OR
- Approx Contract:
- $100,000
- Status:
- Completed - Nov 2016
- Structure Type:
- Design Build
Scope Of Work
Clear and grub land, excavate down to elevation, Install fabric and place 1" minus over fabric, Install boulders for the spillway, lock into place with grout and Install erosion control blanket.