Logo

Integrity Plumbing

Share

Westville, NJ 08093

Company Info

  • Est. 1988
  • Size 20-49 Employees
  • Annual Vol $6 million - $10 million
  • DUNS # Upon Request

Featured Project Return to Projects List

Salons by JC

Project Information

Project Location:
Voorhees, NJ
Approx Contract:
$200,000
Status:
Completed - Mar 2024
Structure Type:
Misc Project
Products Used:
Plumbing Contractors:
Backflow Certifications
Natural Gas Piping
Plumbing Contractors
Water Line Repair & Replacement
Water Pump Install & Repairs
Backflow Installation
Bathroom Plumbing Contractors
Bidding & Contracting
Pipe Insulation
Tenant Fit-Outs
Services Rendered:
Plumbing Contractors:
Backflow Certifications
Natural Gas Piping
Plumbing Contractors
Water Line Repair & Replacement
Water Pump Install & Repairs
Backflow Installation
Bathroom Plumbing Contractors
Bidding & Contracting
Pipe Insulation
Tank Installation & Removal
Tenant Fit-Outs

References

General Contractor:
ADI Construction

Scope Of Work

  • Excavation, backfill and compaction
  • Furnish and install SCH #40 PVC above and below slab for sanitary waste and vent piping.
  • Furnish and install copper domestic water piping for above slab including main and branch lines.
  • Furnish and install thermal pipe insulation, as per plans
  • Furnish and install gas pipe as per plans
  • Furnish and install fixtures, equipment, materials, and accessories as per plumbing plans.
  • Flush system and sterilize domestic water piping.
  • Fire caulking

Project Images

#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1389353/integrity-plumbing/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.