Company Info

  • Est. 2008
  • Size 5-9 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

CAMP LOKATA, GIRLS SCOUT CAMP GROUND

Project Information

Project Location:
Frazier Park, CA
Status:
Completed
Structure Type:
Misc Project

References

General Contractor:
MCD Construction

Scope Of Work

Project Scope:

The project involved installing the plumbing systems for a Girl Scout Camp Ground, which included:

  • Excavation for Plumbing Lines: Digging trenches to lay down water supply and drainage pipes.
  • Installation of Pipes: Laying and connecting water supply, sewage, and drainage pipes.
  • Utility Connections: Connecting the plumbing system to existing utilities and ensuring proper integration.
  • Installation of Water Heaters: Setting up water heaters to provide hot water for the camp facilities.
  • Final Testing and Inspection: Ensuring all installations were correctly executed and fully operational.

Challenges Overcome:

  • Remote Location: Working in a remote camp location presented logistical challenges for transporting materials and equipment.
  • Complex Pipe Routing: Designing a plumbing system that efficiently routes water and sewage across various camp facilities.
  • Environmental Considerations: Ensuring minimal impact on the surrounding natural environment during excavation and installation.

Unique Solutions Provided:

  • Efficient Logistics Planning: Organized transportation and delivery schedules to ensure timely availability of materials and equipment.
  • Customized Plumbing Layout: Developed a tailored plumbing layout to meet the specific needs of the camp, ensuring efficient water flow and drainage.
  • Eco-Friendly Practices: Implemented environmentally friendly practices during installation to protect the natural surroundings of the camp.

Client/Customer Reaction:

The client was highly satisfied with the plumbing work for their camp ground. They appreciated:

  • Timely Completion: The project was completed on schedule, allowing the camp to open as planned.
  • Quality Installation: The plumbing system was installed to high standards, ensuring reliability and efficiency.
  • Professionalism and Care: The team’s professionalism and attention to environmental protection were highly valued by the client.

Overall, the plumbing project for the Girl Scout Camp Ground was a success, delivering a reliable and efficient plumbing system that met the client’s operational needs and expectations while maintaining respect for the natural environment.

Project Images

#
#
#
#
#
#
#
#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1393131/nolasco-plumbing-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.