Company Info

  • Est. 2008
  • Size 5-9 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

DEL AMO MALL

Project Information

Project Location:
Torrance, CA
Status:
Completed
Structure Type:
Retail Store

References

General Contractor:
CMD Construction, Inc.

Scope Of Work

Project Scope:

The project involved installing the plumbing systems for the restrooms in a mall, which included:

  • Rough-In Plumbing: Laying the initial plumbing infrastructure, including water supply and drainage lines behind the walls.
  • Fixture Installation: Installing sinks, faucets, toilets, urinals, and associated fixtures.
  • Piping and Connections: Ensuring all plumbing fixtures are properly connected to the water supply and sewage systems.
  • Finishing Touches: Ensuring all fixtures are securely installed and operational, with proper sealing and finishing.

Challenges Overcome:

  • High Traffic Area: Working in a busy mall environment required careful planning to minimize disruption to ongoing operations.
  • Precision and Coordination: Coordinating with other trades to ensure the plumbing installations aligned perfectly with the overall restroom design and construction timeline.
  • Adherence to Codes and Standards: Ensuring all installations met stringent building codes and safety standards.

Unique Solutions Provided:

  • Strategic Work Scheduling: Planned work during off-peak hours to reduce the impact on mall visitors and maintain a safe working environment.
  • Advanced Coordination: Worked closely with other contractors to ensure seamless integration of plumbing systems with electrical, HVAC, and structural elements.
  • High-Quality Materials: Used durable and high-quality materials to ensure longevity and reliability of the plumbing systems.

Client/Customer Reaction:

The client was extremely pleased with the plumbing work for the mall restrooms. They appreciated:

  • Professional Execution: The project was completed professionally, with attention to detail and high-quality workmanship.
  • Minimal Disruption: The strategic scheduling and efficient execution minimized disruptions to mall operations and visitors.
  • Compliance and Safety: The installations complied with all relevant codes and standards, ensuring safety and functionality.

Overall, the plumbing project for the mall restrooms was a success, delivering a reliable and well-constructed plumbing system that met the client’s needs and expectations while maintaining a high standard of quality and safety.

Project Images

#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1393131/nolasco-plumbing-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.