Sutton Bridge Railroad Replacement
Project Information
- Project Location:
- Sutton, MA
- Status:
- Completed - Jan 2016
- Structure Type:
- Terminal - Airport / Bus / Railroad
Scope Of Work
Cianbro was contracted by Providence & Worcester (P&W) Railroad to demolish and replace a 100-ft bridge along the active freight line connecting Providence and Worcester. This project was completed in two phases, beginning in December of 2015.
Project Details
Installed a sheet wall on either side of the existing abutments in order to support the cranes needed to replace the bridge
Installed soil anchors for the sheet walls
Demolished and replaced the existing bridge
Lean, Innovative, and Unique Project Solutions
During both phases, Cianbro was challenged with completing the work while still keeping the tracks live. The tracks were to remain live at all times during weekdays, which gave Cianbro limited time to shut down the rails. The railroad closed for two consecutive 72-hour weekend periods during the sheet wall installation and one 72-hour period during the complete bridge replacement. The full commitment and participation of the team ensured the project was completed safely, on time, and resulted in both a very satisfied client and a quality product.