RN Civil Construction
Willis, TX 77378
Featured Project Return to Projects List
Town of Kiowa Water and Wastewater Treatment Plant
Project Information
- Project Location:
- Kiowa, CO
- Approx Contract:
- $5,000,000
- Status:
- Completed
- Structure Type:
- Sewage / Water Treatment Plant
References
- Owner:
- Town of Kiowa, Colorado
Scope Of Work
Project Description:
Type:Â Construction Manager at Risk
Cost: (Current) $4,759,000
RN Civil Construction self performed all earthwork, concrete, yard
piping, interior piping, process equipment, general civil site work for
the project. This work represents approximately 70 percent of the total
contract value.
The project consisted of design and construction of a new Water and WWTP
for the Town of Kiowa, Colorado. The project was a construction manager at
risk project. RN Civil Construction worked closely with the design engineer
throughout design offering cost estimating, value engineering input and
project scheduling. The new treatment plant is needed to replace an existing
lagoon system that was no longer able to meet the Town’s hydraulic and
organic loadings and to provide additional capacity for planned growth in the
Town. The components of the plant include influent screening, influent
pumping, an SBR secondary system UV disinfection and aerobic sludge digestion.