Hamilton Landfill 26 Cap and Buffer Maintenance and Repair
Project Information
- Project Location:
- Novato, CA
- Approx Contract:
- $350,000
- Status:
- Completed - May 2017
- Structure Type:
- Military
References
- Owner:
- U.S. Army Corps of Engineers
Scope Of Work
The Hamilton Landfill Area 26 is a 45 acre site that contains many structures that are used for venting and monitoring. Capers provided all resources for the removal of old paint and the application of primer and top coat on the sites vent trench vertical risers, monitoring wells, pads, and bollards. Capers personnel repaired numerous drain screen covers and its geotextile fabric and gravel, marking them with a safety-yellow pole. Capers performed the annual mowing and brush removal on the 45 acre site which included the cap deck, buffer zone, around the monitoring wells, trench vents, and treatment plant up to the Hamilton Meadows sound wall. Coordination of all equipment and materials was done by Capers Services and the project was completed successfully and on time. Since we were able to complete this project with a good review from the city of Novato, the U.S. Army Corps of Engineers awarded Capers Services this project again in 2010 with a 5 year option plan.