01 00 00 - General Requirements
01 24 00 - Value Analysis
01 24 13 - Value Engineering
01 29 00 - Payment Procedures
01 29 83 - Payment Procedures for Testing Laboratory Services
01 31 00 - Project Management and Coordination
01 31 13 - Project Coordination
01 31 19.13 - Preconstruction Meetings
01 35 00 - Special Procedures
01 35 16 - Alteration Project Procedures
01 45 00 - Quality Control
01 45 26 - Plant Inspection Procedures
01 71 00 - Examination and Preparation
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00 - Performance Requirements
01 80 00.00.01 - Performance Requirements
01 82 00 - Facility Substructure Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 00 - Facility Shell Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 00 - Interiors Performance Requirements
01 84 16 - Stairways Performance Requirements
01 84 19 - Interior Finishes Performance Requirements
01 85 00 - Conveying Equipment Performance Requirements
01 85 00.00.01 - Conveying Equipment Performance Requirements
01 86 00 - Facility Services Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 87 00 - Equipment and Furnishings Performance Requirements
01 87 13 - Equipment Performance Requirements
01 88 00 - Other Facility Construction Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 88 16 - Selective Construction Performance Requirements
01 91 00 - Commissioning
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
01 91 23 - Interiors Commissioning
01 91 23.13 - Interior Construction Commissioning
01 91 23.43 - Stairways Commissioning
02 00 00 - Existing Conditions
02 06 00 - Schedules for Existing Conditions
02 06 30 - Schedules for Subsurface Investigations
02 08 00 - Commissioning of Existing Conditions
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 00 - Existing Conditions Assessment
02 22 19 - Traffic Assessment
02 25 00 - Existing Material Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 00 - Geophysical Investigations
02 31 29 - Magnetotelluric Investigations
02 32 00 - Geotechnical Investigations
02 32 23 - Geotechnical Monitoring Before Construction
03 00 00 - Concrete
03 08 00 - Commissioning of Concrete
03 08 00.00.01 - Commissioning of Concrete
04 00 00 - Masonry
04 08 00 - Commissioning of Masonry
04 08 00.00.01 - Commissioning of Masonry
05 00 00 - Metals
05 08 00 - Commissioning of Metals
05 08 00.00.01 - Commissioning of Metals
06 00 00 - Wood, Plastics, & Composites
06 08 00 - Commissioning of Wood, Plastics, and Composites
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
09 00 00 - Finishes
09 01 00 - Maintenance of Finishes
09 01 20 - Maintenance of Plaster and Gypsum Board
09 06 00 - Schedules for Finishes
09 06 20 - Schedules for Plaster and Gypsum Board
10 00 00 - Specialties
10 08 00 - Commissioning of Specialties
10 08 00.00.01 - Commissioning of Specialties
11 00 00 - Equipment
11 08 00 - Commissioning of Equipment
11 08 00.00.01 - Commissioning of Equipment
13 00 00 - Special Construction
13 01 00 - Operation and Maintenance of Special Construction
13 01 21 - Operation and Maintenance of Controlled Environment Rooms
13 08 00 - Commissioning of Special Construction
13 08 11 - Commissioning of Swimming Pools
13 08 21 - Commissioning of Controlled Environment Rooms
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
13 21 00 - Controlled Environment Rooms
13 21 13 - Clean Rooms
13 21 29 - Constant Temperature Rooms
13 50 00 - Special Instrumentation
13 50 00.00.01 - Special Instrumentation
21 00 00 - Fire Suppression
21 08 00 - Commissioning of Fire Suppression
21 08 00.00.01 - Commissioning of Fire Suppression
22 00 00 - Plumbing
22 01 00 - Operation and Maintenance of Plumbing
22 01 10 - Operation and Maintenance of Plumbing Piping and Pumps
22 01 30 - Operation and Maintenance of Plumbing Equipment
22 01 40 - Operation and Maintenance of Plumbing Fixtures
22 06 00 - Schedules for Plumbing
22 06 10 - Schedules for Plumbing Piping and Pumps
22 06 10.13 - Plumbing Pump Schedule
22 06 30.13 - Domestic Water Heater Schedule
22 08 00 - Commissioning of Plumbing
22 08 00.00.01 - Commissioning of Plumbing
22 10 00 - Plumbing Piping and Pumps
22 10 00.00.01 - Plumbing Piping and Pumps
22 13 00 - Facility Sanitary Sewerage
22 13 19.13 - Sanitary Drains
23 00 00 - Heating, Ventilating, & Air Conditioning
23 01 00 - Operation and Maintenance of HVAC Systems
23 01 20 - Operation and Maintenance of HVAC Piping and Pumps
23 01 80 - Operation and Maintenance of Decentralized HVAC Equipment
23 06 00 - Schedules for HVAC
23 06 20 - Schedules for HVAC Piping and Pumps
23 06 50.13 - Heating Boiler Schedule
23 06 80.16 - Convection Heating and Cooling Unit Schedule
23 08 00 - Commissioning of HVAC
23 08 00.00.01 - Commissioning of HVAC
23 09 00 - Instrumentation and Control for HVAC
23 09 13 - Instrumentation and Control Devices for HVAC
23 09 13.13 - Actuators and Operators
23 09 13.23 - Sensors and Transmitters
23 09 23 - Direct-Digital Control System for HVAC
23 09 33 - Electric and Electronic Control System for HVAC
23 09 43 - Pneumatic Control System for HVAC
23 09 53 - Pneumatic and Electric Control System for HVAC
23 09 93 - Sequence of Operations for HVAC Controls
23 20 00 - HVAC Piping and Pumps
23 20 00.00.01 - HVAC Piping and Pumps
25 00 00 - Integrated Automation
25 01 00 - Operation and Maintenance of Integrated Automation
25 01 10 - Operation and Maintenance of Integrated Automation Network Equipment
25 01 20 - Operation and Maintenance of Integrated Equipment
25 01 30 - Operation and Maintenance of Integrated Automation Instrumentation and Terminal Devices
25 01 90 - Diagnostic Systems for Integrated Automation
25 05 00 - Common Work Results for Integrated Automation
25 05 26 - Grounding and Bonding for Integrated Automation
25 05 53 - Identification for Integrated Automation
25 06 00 - Schedules for Integrated Automation
25 06 11 - Schedules for Integrated Automation Network
25 06 12 - Schedules for Integrated Automation Network Gateways
25 06 13 - Schedules for Integrated Automation Control and Monitoring Network
25 06 14 - Schedules for Integrated Automation Local Control Units
25 06 30 - Schedules for Integrated Automation Instrumentation and Terminal Devices
25 08 00 - Commissioning of Integrated Automation
25 08 00.00.01 - Commissioning of Integrated Automation
25 30 00 - Integrated Automation Instrumentation and Terminal Devices
25 30 00.00.01 - Integrated Automation Instrumentation and Terminal Devices
25 31 00 - Integrated Automation Instrumentation and Terminal Devices for Facility Equipment
25 31 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Facility Equipment
25 35 00 - Integrated Automation Instrumentation and Terminal Devices for HVAC
25 35 19 - Integrated Automation Control Valves
25 35 26 - Integrated Automation Compressed Air Supply
25 36 00 - Integrated Automation Instrumentation and Terminal Devices for Electrical Systems
25 36 19 - Integrated Automation Current Sensors
25 38 00 - Integrated Automation Instrumentation and Terminal Devices for Electronic Safety and Security Systems
25 38 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Electronic Safety and Security Systems
25 50 00 - Integrated Automation Facility Controls
25 50 00.00.01 - Integrated Automation Facility Controls
25 51 00 - Integrated Automation Control of Facility Equipment
25 51 00.00.01 - Integrated Automation Control of Facility Equipment
25 55 00 - Integrated Automation Control of HVAC
25 55 00.00.01 - Integrated Automation Control of HVAC
25 56 00 - Integrated Automation Control of Electrical Systems
25 56 00.00.01 - Integrated Automation Control of Electrical Systems
25 90 00 - Integrated Automation Control Sequences
25 90 00.00.01 - Integrated Automation Control Sequences
25 91 00 - Integrated Automation Control Sequences for Facility Equipment
25 91 00.00.01 - Integrated Automation Control Sequences for Facility Equipment
25 95 00 - Integrated Automation Control Sequences for HVAC
25 95 00.00.01 - Integrated Automation Control Sequences for HVAC
25 96 00 - Integrated Automation Control Sequences for Electrical Systems
25 96 00.00.01 - Integrated Automation Control Sequences for Electrical Systems
26 00 00 - Electrical
26 01 00 - Operation and Maintenance of Electrical Systems
26 01 10 - Operation and Maintenance of Medium-Voltage Electrical Distribution
26 01 20 - Operation and Maintenance of Low-Voltage Electrical Distribution
26 05 00 - Common Work Results for Electrical
26 05 73 - Overcurrent Protective Device Coordination Study
26 06 00 - Schedules for Electrical
26 06 10 - Schedules for Medium-Voltage Electrical Distribution
26 06 20 - Schedules for Low-Voltage Electrical Distribution
26 06 20.26 - Wiring Device Schedule
26 08 00 - Commissioning of Electrical Systems
26 08 00.00.01 - Commissioning of Electrical Systems
26 09 00 - Instrumentation and Control for Electrical Systems
26 09 23 - Lighting Control Devices
26 09 36 - Modular Dimming Controls
26 09 36.13 - Manual Modular Dimming Controls
26 09 36.16 - Integrated Multipreset Modular Dimming Controls
26 09 43 - Network Lighting Controls
26 09 43.13 - Digital-Network Lighting Controls
26 09 43.16 - Addressable Fixture Lighting Control
26 10 00 - Medium-Voltage Electrical Distribution
26 10 00.00.01 - Medium-Voltage Electrical Distribution
26 18 00 - Medium-Voltage Circuit Protection Devices
26 18 13 - Medium-Voltage Cutouts
26 20 00 - Low-Voltage Electrical Distribution
26 20 00.00.01 - Low-Voltage Electrical Distribution
26 21 00 - Low-Voltage Overhead Electrical Power Systems
26 21 00.00.01 - Low-Voltage Overhead Electrical Power Systems
26 24 00 - Switchboards and Panelboards
26 24 19 - Motor-Control Centers
26 27 00 - Low-Voltage Distribution Equipment
26 27 13 - Electricity Metering
26 43 00 - Transient Voltage Suppression
26 43 13 - Transient-Voltage Suppression for Low-Voltage Electrical Power Circuits
27 00 00 - Communications
27 05 00 - Common Work Results for Communications
27 05 26 - Grounding and Bonding for Communications Systems
27 08 00 - Commissioning of Communications
27 08 00.00.01 - Commissioning of Communications
28 00 00 - Electronic Safety & Security
28 08 00 - Commissioning of Electronic Safety and Security
28 08 00.00.01 - Commissioning of Electronic Safety and Security
31 00 00 - Earthwork
31 08 00 - Commissioning of Earthwork
31 08 00.00.01 - Commissioning of Earthwork
31 09 00 - Geotechnical Instrumentation and Monitoring of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
32 00 00 - Exterior Improvements
32 08 00 - Commissioning of Exterior Improvements
32 08 00.00.01 - Commissioning of Exterior Improvements
33 00 00 - Utilities
33 08 00 - Commissioning of Utilities
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 12 00 - Water Utility Distribution Equipment
33 12 33 - Water Utility Metering
33 51 00 - Natural-Gas Distribution
33 51 33 - Natural-Gas Metering
33 61 00 - Hydronic Energy Distribution
33 61 33 - Hydronic Energy Distribution Metering
33 63 00 - Steam Energy Distribution
33 63 33 - Steam Energy Distribution Metering
33 71 00 - Electrical Utility Transmission and Distribution
33 71 36 - Extra-High-Voltage Wiring
33 71 36.13 - Overhead Extra-High-Voltage Wiring
33 71 39 - High-Voltage Wiring
33 71 39.13 - Overhead High-Voltage Wiring
33 71 49 - Medium-Voltage Wiring
33 71 49.13 - Overhead Medium-Voltage Wiring
33 71 73 - Electrical Utility Services
33 71 73.33 - Electric Meters
33 81 00 - Communications Structures
33 81 23 - Aerial Cable Installation Hardware
34 00 00 - Transportation
34 08 00 - Commissioning of Transportation
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
34 21 00 - Traction Power Distribution
34 21 16 - Traction Power Substations
34 21 16.13 - AC Traction Power Substations
34 21 16.16 - DC Traction Power Substations
34 43 00 - Airfield Signaling and Control Equipment
34 43 26.13 - Airfield Lighting Control Equipment
34 43 26.16 - Airfield Lighting PLC Control Equipment
35 00 00 - Waterway & Marine Construction
35 08 00 - Commissioning of Waterway and Marine Construction
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 00 00 - Process Integration
40 80 00 - Commissioning of Process Systems
40 80 00.00.01 - Commissioning of Process Systems
40 90 00 - Instrumentation and Control for Process Systems
40 90 00.00.01 - Instrumentation and Control for Process Systems
40 92 00 - Primary Control Devices
40 92 49 - Variable Frequency Drives
40 94 00 - Digital Process Controllers
40 94 23 - Distributed Process Control Systems
40 94 43 - Programmable Logic Process Controllers
40 95 00 - Process Control Hardware
40 95 73 - Process Control Wiring
41 00 00 - Material Processing & Handling Equipment
41 08 00 - Commissioning of Material Processing and Handling Equipment
41 08 30 - Commissioning of Manufacturing Equipment
42 00 00 - Process Heating, Cooling, & Drying Equipment
42 08 00 - Commissioning of Process Heating, Cooling, and Drying Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 00 00 - Process Gas & Liquid Handling, Purification....
43 08 00 - Commissioning of Process Gas and Liquid Handling, Purification, and Storage Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 00 00 - Pollution Control Equipment
44 08 00 - Commissioning of Pollution Control Equipment
44 08 40 - Commissioning Water Treatment Equipment
45 00 00 - Industry-Specific Manufacturing Equipment
45 08 00 - Commissioning of Industry-Specific Manufacturing Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 00 00 - Electrical Power Generation
48 08 00 - Commissioning of Electrical Power Generation
48 08 00.00.01 - Commissioning of Electrical Power Generation