Replace Hydrant Fuel System
Project Information
- Project Location:
- Travis Afb, CA
- Approx Contract:
- $30,000,000
- Status:
- In-Progress
- Structure Type:
- Storage Facility / Warehouse
Scope Of Work
The project constructs a new Type-III Hydrant System with two 10,000-barrel Aboveground Storage Tanks (AST) and a 2,400-gallons-per-minute (GPM) pump house at the existing 900 ramp site, and construct a new 12 inch JP-8 piping loop between the new operating storage and 12 new hydrant pits. The project demolishes and removes two 5,000-barrel operating storage tanks, one pump house, and seven hydrant pits. The project also abandons-in-place approximately 4,500 lineal feet of hydrant piping. The project also constructs one new truck off-load stand with a single Return To Bulk (RTB) connection. Also included with the new operating storage facility are access roads, concrete secondary containment, containment drainage, canopies, control system, and lighting.