Vibration Engineering Consultants

Pacifica, CA 94044

Company Info

  • Est. 1983
  • Size 5-9 Employees
  • Annual Vol $1 million - $3 million

Featured Project Return to Projects List

PopmintchevLABS

Project Information

Project Location:
San Diego, CA
Approx Contract:
$30,000
Status:
In-Progress - Jan 2020
Structure Type:
Laboratory

References

Architect:
Taylor Designs

Scope Of Work

Project overview: VEC worked directly for an architectural firm to provide vibration, magnetic field, and acoustic noise testing and consulting services for the creation of a new laser lab at the University of California San Diego

Phase 1: Initial Site Surveys and Analysis of Existing Conditions

Key tasks

  • Conduct site survey measuring existing vibration, AC EMI, DC EMI, and acoustics in four rooms throughout the lab space
  • Compare results to OEM generated specifications

Deliverables

  • Complete Initial Site Survey for each tool (report will be provided within 1 week of survey completion)

Duration

  • 1-2 days plus report preparation

Phase 2: Mitigation Recommendations and Design Consulting

Key tasks

  • Provide mitigation recommendations based on the results of the Site Survey
  • Provide guidance on other environmental considerations with the site design and tool layout
  • Be available for design meetings as needed

Deliverables

  • Communicate recommendations for design, site suitability, and remediation recommendations

Duration

  • As needed over the course of Schematic Design Review phase

Phase 3: Acoustic Noise Modeling

Key tasks

  • Model the acoustic noise at the laser location based on sources in the laboratory space
  • Predict the acoustic noise levels of acoustic noise sources in the laboratory space
  • Model the Sound Transmission Loss for the wall based on drawing details
  • Model the Radiant and Discharge Noise for the planned air handler system

Deliverables

  • 3D model based on BIM360 drawings of the acoustic noise on the laser tables

Duration

  • 5 days of design and report creation

Phase 4: Site Validation and Final Survey

Key tasks

  • Conduct site survey at Laser System #1 and Future Laser System #2
  • Validate that site is within system specifications

Deliverables

  • Complete Final Site Survey for both Laser Systems (report will be provided within 1 week of completion)

Duration

  • 1-2 days plus report preparation

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/1614415/vibration-engineering-consultants/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.