Vibration Engineering Consultants
Pacifica, CA 94044
Featured Project Return to Projects List
PopmintchevLABS
Project Information
- Project Location:
- San Diego, CA
- Approx Contract:
- $30,000
- Status:
- In-Progress - Jan 2020
- Structure Type:
- Laboratory
References
- Architect:
- Taylor Designs
Scope Of Work
Project overview: VEC worked directly for an architectural firm to provide vibration, magnetic field, and acoustic noise testing and consulting services for the creation of a new laser lab at the University of California San Diego
Phase 1: Initial Site Surveys and Analysis of Existing Conditions
Key tasks
- Conduct site survey measuring existing vibration, AC EMI, DC EMI, and acoustics in four rooms throughout the lab space
- Compare results to OEM generated specifications
Deliverables
- Complete Initial Site Survey for each tool (report will be provided within 1 week of survey completion)
Duration
- 1-2 days plus report preparation
Phase 2: Mitigation Recommendations and Design Consulting
Key tasks
- Provide mitigation recommendations based on the results of the Site Survey
- Provide guidance on other environmental considerations with the site design and tool layout
- Be available for design meetings as needed
Deliverables
- Communicate recommendations for design, site suitability, and remediation recommendations
Duration
- As needed over the course of Schematic Design Review phase
Phase 3: Acoustic Noise Modeling
Key tasks
- Model the acoustic noise at the laser location based on sources in the laboratory space
- Predict the acoustic noise levels of acoustic noise sources in the laboratory space
- Model the Sound Transmission Loss for the wall based on drawing details
- Model the Radiant and Discharge Noise for the planned air handler system
Deliverables
- 3D model based on BIM360 drawings of the acoustic noise on the laser tables
Duration
- 5 days of design and report creation
Phase 4: Site Validation and Final Survey
Key tasks
- Conduct site survey at Laser System #1 and Future Laser System #2
- Validate that site is within system specifications
Deliverables
- Complete Final Site Survey for both Laser Systems (report will be provided within 1 week of completion)
Duration
- 1-2 days plus report preparation