Bates Engineers/Contractors, Inc.

Share

Bainbridge, GA 39817

Company Info

  • Est. 1962
  • Size 100-249 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Pooler WWTP

Project Information

Project Location:
Pooler, GA
Status:
Completed
Structure Type:
Sewage / Water Treatment Plant

Scope Of Work

Bates served as the Prime Contractor for this new 2.5 MGD Membrane Bio Reactor (MBR) wastewater treatment facility.  Major work items included influent pump station, headworks including bar screen and grit chamber, equalization basin, 3MM fine screens, MBR structure/building, UV disinfection system, effluent cascade aerator structure, re-use water pump station, 2 each sludge holding tanks, belt press facility, and control/laboratory facility.  To support plant operations, a complex SCADA system was implemented along with an emergency generator/ATS.  Project was the first MBR facility to be constructed for a municipality in Georgia.  Contract also required ½ mile road system built through Georgia coastal wetlands and large box culvert system to traverse canals.  All major structures were founded on driven piles.  In addition to the new plant work, Bates was also responsible for completing re-routing of the influent from the old city treatment facility to the new MBR plant.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1730640/bates-engineers-contractors-inc/general-contractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.