Preble Shawnee Junior High School & High School Renovations
Project Information
- Project Location:
- Camden, OH
- Status:
- Completed - Jan 2020
- Structure Type:
- Design Build
Services Rendered:
Mechanical Contractors:
Air Conditioning
Refrigeration
Backflow Preventer
Controls
Design-Build
Heating
Plumbing
Service
Sheet Metal
Ventilation
HVAC/R
Building Automation
Energy Solutions
Maintenance
System Designs
CAD & BIM
References
- Owner:
- Preble Shawnee
- General Contractor:
- Energy Optimizers
Scope Of Work
Scope of Work:
- Over 9,800 feet of new hydronic piping
- (10 289.5 T Screw Chiller
- (80) Unit Ventilators
- (10) Air Handler Units
- (7) VAVs
- (7) Horizontal Unit Heaters
- (1) Duct Mounted reheat Coil
- (3) New Boilers with a total capacity of 7,947,000 BTU/H
- (2) Hot Water Heater Primary Pumps
- (2) Chilled Water Primary Pumps
One of the challenges we faced was scheduling conflicts due to long equipment lead times directly related to Covid. In order to solve this challenge we teamed up with a local mechanical contractor to ensure deadlines were met. Over all the client was pleased with our workmanship.