Pro-Air Co.
Jupiter, FL 33458
Featured Project Return to Projects List
CARNIVAL CRUISE LINES
Project Information
- Project Location:
- MIAMI, FL
- Status:
- Completed - Sep 1996
- Structure Type:
- Misc Project
Scope Of Work
DESIGN CONSULTANT
JOHNSON, HERNANDEZ AND ASSOCIATES, INC.
ORLANDO HERNANDEZ, PE
TEL: 305-594-0660; FAX: 305-594-0907
MECHANICAL CONTRACTOR
THE POOLE & KENT CO., MIMAI, FL.
TEL: 305-325-1930; FAX: 305-324-0522
PROJECT MANAGER: CHARLES K. NEESE
NOTE: There were also additional sub-mechanical contractors for different floors.
TAB SUPERVISOR
V. MIKE STANIMIROVIC, PE/TAB Supervisor
OFFICE BUILDING
6-story structure with separate Chilled Water Plant which, also supplies existing office building.
HVAC Systems
Variable Air Volume Systems. Air volume flow/system static pressure is controlled by DDC and variable frequency drivers. Building Automation System (BAS) is Trane Tracer Summit.
Air handlers are utilized for smoke removal in conjunction with smoke exhaust and stairwells/elevator shafts pressurization fans.
Total air flow for air conditioning is 213,400 CFM.
VAV Terminal Boxes, VAV Diffusers and Air Distribution are Warren Technology; models FBI, ST and Leopard Intellivent.
HYDRONIC SYSTEM
-Three water chillers 600 tons/ea; total 1800 tons.
-Three cooling towers, 600 cooling tons/ea.
-Primary and Secondary chilled water pumping.
-Turbine pumps for condenser water pumping.