Richard Goettle, Inc.

Cincinnati, OH 45231

Company Info

  • Est. 1956
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

Our main lines of business include: Pile Driving & Drilling Contractors, Soil Stabilization, Underpinning Contractors, Foundation Contractors--Geotechnical.

Richard Goettle, Inc. has been listed in the Blue Book since 1998.

What We Do

  • Foundation Contractors--Geotechnical
  • Pile Driving & Drilling Contractors
  • Soil Stabilization
  • Underpinning Contractors

Regions & Counties Serviced

  • Cincinnati, Columbus, Dayton - Southern Ohio

Ohio 1

  • Hamilton

Our CSI Codes

02 57 16 - Sinkhole Remediation by Backfilling
03 06 30.23 - Concrete Shaft Schedule
06 13 33 - Heavy Timber Pier Construction
31 01 40 - Maintenance of Shoring and Underpinning
31 01 63 - Maintenance of Bored and Augered Piles
31 01 63.61 - Bored and Augered Pile Repairs
31 06 40 - Schedules for Shoring and Underpinning
31 06 50 - Schedules for Excavation Support and Protection
31 06 60 - Schedules for Special Foundations and Load Bearing Elements
31 06 60.16 - Caisson Schedule
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 32 36 - Soil Nailing
31 32 36.13 - Driven Soil Nailing
31 32 36.19 - Corrosion-Protected Soil Nailing
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 40 00.00.01 - Shoring and Underpinning
31 45 13 - Vibroflotation
31 45 16 - Densification
31 46 13 - Cantilever Needle Beams
31 48 13 - Underpinning Piers
31 48 19 - Bracket Piers
31 48 33 - Micropile Underpinning
31 51 13 - Excavation Soil Anchors
31 51 16 - Excavation Rock Anchors
31 52 13 - Sheet Piling Cofferdams
31 52 16 - Timber Cofferdams
31 52 19 - Precast Concrete Cofferdams
31 54 00.00.01 - Ground Freezing
31 56 13 - Bentonite Slurry Walls
31 56 13.13 - Soil-Bentonite Slurry Walls
31 56 13.16 - Cement-Bentonite Slurry Walls
31 56 13.19 - Slag-Cement-Bentonite Slurry Walls
31 56 13.23 - Soil-Cement-Bentonite Slurry Walls
31 56 13.26 - Pozzolan-Bentonite Slurry Walls
31 56 13.29 - Organically-Modified Bentonite Slurry Walls
31 56 16 - Attipulgite Slurry Walls
31 56 16.13 - Soil-Attipulgite Slurry Walls
31 56 19 - Slurry-Geomembrane Composite Slurry Walls
31 56 23 - Lean Concrete Slurry Walls
31 60 00.00.01 - Special Foundations and Load-Bearing Elements
31 63 19.13 - Rock Sockets for Piles
31 63 26 - Drilled Caissons
31 63 26.13 - Fixed End Caisson Piles
31 63 26.16 - Concrete Caissons for Marine Construction
31 63 29 - Drilled Concrete Piers and Shafts
31 63 29.13 - Uncased Drilled Concrete Piers
31 64 13 - Box Caissons
31 64 16 - Excavated Caissons
31 64 19 - Floating Caissons
31 64 23 - Open Caissons
31 64 26 - Pneumatic Caissons
31 64 29 - Sheeted Caissons
31 66 16.46 - Slurry Diaphragm Foundation Walls
31 66 16.53 - Soldier-Beam Foundation Walls
31 68 13 - Rock Foundation Anchors
31 72 13 - Rock Reinforcement and Initial Support
31 75 13 - Cast-in-Place Concrete Shaft Lining
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
32 11 33 - Cement-Treated Base Courses
32 32 34 - Reinforced Soil Retaining Walls
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 05 30 - Common Work Results for Coastal Construction
35 05 50 - Common Work Results for Marine Construction
35 06 30 - Schedules for Coastal Construction
35 06 50 - Schedules for Marine Construction
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 35 - Slope Protection Bank Protection
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 43 35 - Slope Protection Scour Protection
35 43 37 - Riprap Scour Protection
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 53 43 - Underwater Foundation Construction
35 59 13 - Marine Fenders
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 71 19 - Rockfill Gravity Dams
35 73 16 - Rock Embankment Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders

Project Experience

  • Union
  • Non-Union
  • Public
  • Private
  • Projects From $2,000,001 to $2,000,000,000

Gallery

Featured Image 1
We are located in Hamilton County.

Associations & Memberships

ASA (American Subcontractors Assn.)
ASA (American Subcontractors Assn.)
Share URL copied!
https://www.thebluebook.com/iProView/278079/richard-goettle-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.