Turino Group
Providence, RI 02908
Featured Project Return to Projects List
Great Island Bridge Replacement (4D Scheduling)
Project Information
- Project Location:
- Narragansett, RI
- Approx Contract:
- $8,500,000
- Status:
- In-Progress - Mar 2017
- Structure Type:
- Bridge
References
- Owner:
- RIDOT
- Architect:
- Not Provided
- General Contractor:
- Not Provided
Scope Of Work
Turino led a team that modeled and developed the 4D Schedule for this bridge replacement. By highlighting the construction sequence with the representation of construction equipment, we assisted in conveying the size impacts of equipment choices. Additional work consists of tracking the progress of this project during construction, assisting RIDOT in identifying potential risks through the 4D model, and producing videos and stills to aid in design collaboration and the bidding process.