01 00 00 - General Requirements
01 41 00 - Regulatory Requirements
01 41 13 - Codes
01 41 26 - Permits
01 45 00 - Quality Control
01 45 26 - Plant Inspection Procedures
01 51 00 - Temporary Utilities
01 51 16 - Temporary Fire Protection
01 71 00 - Examination and Preparation
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 80 00 - Performance Requirements
01 80 00.00.01 - Performance Requirements
01 82 00 - Facility Substructure Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 00 - Facility Shell Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 00 - Interiors Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 00 - Facility Services Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 00 - Other Facility Construction Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 00 - Commissioning
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 00 00 - Existing Conditions
02 06 00 - Schedules for Existing Conditions
02 06 30 - Schedules for Subsurface Investigations
02 08 00 - Commissioning of Existing Conditions
02 08 00.00.01 - Commissioning of Existing Conditions
02 22 00 - Existing Conditions Assessment
02 22 19 - Traffic Assessment
02 25 00 - Existing Material Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 31 00 - Geophysical Investigations
02 31 29 - Magnetotelluric Investigations
02 32 00 - Geotechnical Investigations
02 32 23 - Geotechnical Monitoring Before Construction
05 00 00 - Metals
05 08 00 - Commissioning of Metals
05 08 00.00.01 - Commissioning of Metals
06 00 00 - Wood, Plastics, & Composites
06 08 00 - Commissioning of Wood, Plastics, and Composites
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
09 00 00 - Finishes
09 01 00 - Maintenance of Finishes
09 01 00 - Maintenance of Finishes
10 00 00 - Specialties
10 01 00 - Operation and Maintenance of Specialties
10 01 40 - Operation and Maintenance of Safety Specialties
10 06 00 - Schedules for Specialties
10 06 40 - Schedules for Safety Specialties
10 08 00 - Commissioning of Specialties
10 08 00.00.01 - Commissioning of Specialties
10 40 00 - Safety Specialties
10 40 00.00.01 - Safety Specialties
10 41 00 - Emergency Access and Information Cabinets
10 41 13 - Fire Department Plan Cabinets
10 44 00 - Fire Protection Specialties
10 44 13 - Fire Extinguisher Cabinets
10 44 13.53 - Security Fire Extinguisher Cabinets
10 44 16 - Fire Extinguishers
10 44 16.13 - Portable Fire Extinguishers
10 44 16.16 - Wheeled Fire Extinguisher Units
10 44 33 - Fire Blankets and Cabinets
10 44 43 - Fire Extinguisher Accessories
11 00 00 - Equipment
11 08 00 - Commissioning of Equipment
11 08 00.00.01 - Commissioning of Equipment
13 00 00 - Special Construction
13 08 00 - Commissioning of Special Construction
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 00 00 - Fire Suppression
21 01 00 - Operation and Maintenance of Fire Suppression
21 01 10 - Operation and Maintenance of Water-Based Fire-Suppression Systems
21 01 20 - Operation and Maintenance of Fire-Extinguishing Systems
21 01 30 - Operation and Maintenance of Fire-Suppression Equipment
21 05 00 - Common Work Results for Fire Suppression
21 05 13 - Common Motor Requirements for Fire-Suppression Equipment
21 05 16 - Expansion Fittings and Loops for Fire-Suppression Piping
21 06 00 - Schedules for Fire Suppression
21 06 10 - Schedules for Water-Based Fire-Suppression Systems
21 06 20 - Schedules for Fire-Extinguishing Systems
21 06 30 - Schedules for Fire-Suppression Equipment
21 08 00 - Commissioning of Fire Suppression
21 08 00.00.01 - Commissioning of Fire Suppression
21 09 00 - Instrumentation and Control for Fire-Suppression Systems
21 09 00.00.01 - Instrumentation and Control for Fire-Suppression Systems
21 10 00 - Water-Based Fire-Suppression Systems
21 10 00.00.01 - Water-Based Fire-Suppression Systems
21 11 00 - Facility Fire-Suppression Water-Service Piping
21 11 16 - Facility Fire Hydrants
21 11 19 - Fire-Department Connections
21 12 00 - Fire-Suppression Standpipes
21 12 13 - Fire-Suppression Hoses and Nozzles
21 12 16 - Fire-Suppression Hose Reels
21 12 19 - Fire-Suppression Hose Racks
21 12 26 - Fire-Suppression Valve and Hose Cabinets
21 13 00 - Fire-Suppression Sprinkler Systems
21 13 13 - Wet-Pipe Sprinkler Systems
21 13 16 - Dry-Pipe Sprinkler Systems
21 13 19 - Preaction Sprinkler Systems
21 13 23 - Combined Dry-Pipe and Preaction Sprinkler Systems
21 13 26 - Deluge Fire-Suppression Sprinkler Systems
21 13 29 - Water Spray Fixed Systems
21 13 36 - Antifreeze Sprinkler Systems
21 13 39 - Foam-Water Systems
21 20 00 - Fire-Extinguishing Systems
21 20 00.00.01 - Fire-Extinguishing Systems
21 21 00 - Carbon-Dioxide Fire-Extinguishing Systems
21 21 13 - Carbon-Dioxide Fire-Extinguishing Piping
21 21 16 - Carbon-Dioxide Fire-Extinguishing Equipment
21 22 00 - Clean-Agent Fire-Extinguishing Systems
21 22 13 - Clean-Agent Fire-Extinguishing Piping
21 22 16 - Clean-Agent Fire-Extinguishing Equipment
21 23 00 - Wet-Chemical Fire-Extinguishing Systems
21 23 13 - Wet-Chemical Fire-Extinguishing Piping
21 23 16 - Wet-Chemical Fire-Extinguishing Equipment
21 24 00 - Dry-Chemical Fire-Extinguishing Systems
21 24 13 - Dry-Chemical Fire-Extinguishing Piping
21 24 16 - Dry-Chemical Fire-Extinguishing Equipment
21 30 00 - Fire Pumps
21 30 00.00.01 - Fire Pumps
21 31 00 - Centrifugal Fire Pumps
21 31 13 - Electric-Drive, Centrifugal Fire Pumps
21 31 16 - Diesel-Drive, Centrifugal Fire Pumps
21 32 00 - Vertical-Turbine Fire Pumps
21 32 13 - Electric-Drive, Vertical-Turbine Fire Pumps
21 32 16 - Diesel-Drive, Vertical-Turbine Fire Pumps
21 33 00 - Positive-Displacement Fire Pumps
21 33 13 - Electric-Drive, Positive-Displacement Fire Pumps
21 33 16 - Diesel-Drive, Positive-Displacement Fire Pumps
21 41 00 - Storage Tanks for Fire-Suppression Water
21 41 13 - Pressurized Storage Tanks for Fire-Suppression Water
21 41 29 - Storage Tanks for Fire-Suppression Water Additives
22 00 00 - Plumbing
22 08 00 - Commissioning of Plumbing
22 08 00.00.01 - Commissioning of Plumbing
23 00 00 - Heating, Ventilating, & Air Conditioning
23 08 00 - Commissioning of HVAC
23 08 00.00.01 - Commissioning of HVAC
23 22 00 - Steam and Condensate Piping and Pumps
23 22 13.13 - Underground Steam and Condensate Heating Piping
25 00 00 - Integrated Automation
25 08 00 - Commissioning of Integrated Automation
25 08 00.00.01 - Commissioning of Integrated Automation
25 33 00 - Integrated Automation Instrumentation and Terminal Devices for Fire-Suppression Systems
25 33 00.00.01 - Integrated Automation Instrumentation and Terminal Devices for Fire-Suppression Systems
25 53 00 - Integrated Automation Control of Fire-Suppression Systems
25 53 00.00.01 - Integrated Automation Control of Fire-Suppression Systems
25 93 00 - Integrated Automation Control Sequences for Fire-Suppression Systems
25 93 00.00.01 - Integrated Automation Control Sequences for Fire-Suppression Systems
26 00 00 - Electrical
26 05 00 - Common Work Results for Electrical
26 05 43 - Underground Ducts and Raceways for Electrical Systems
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00 - Commissioning of Electrical Systems
26 08 00.00.01 - Commissioning of Electrical Systems
27 00 00 - Communications
27 08 00 - Commissioning of Communications
27 08 00.00.01 - Commissioning of Communications
28 00 00 - Electronic Safety & Security
28 01 00 - Operation and Maintenance of Electronic Safety and Security
28 01 30 - Operation and Maintenance of Electronic Detection and Alarm
28 01 30.51 - Maintenance and Administration of Electronic Detection and Alarm
28 01 30.71 - Revisions and Upgrades of Electronic Detection and Alarm
28 06 00 - Schedules for Electronic Safety and Security
28 06 30 - Schedules for Electronic Detection and Alarm
28 08 00 - Commissioning of Electronic Safety and Security
28 08 00.00.01 - Commissioning of Electronic Safety and Security
28 16 00 - Intrusion Detection
28 16 33 - Intrusion Detection Interfaces
28 16 33.36 - Intrusion Detection Interfaces to Fire Alarm
28 16 46 - Intrusion Detection Vehicle Control Systems
28 26 00 - Electronic Personal Protection Systems
28 26 16 - Electronic Personal Safety Alarm Annunciation and Control Systems
28 30 00 - Electronic Detection and Alarm
28 30 00.00.01 - Electronic Detection and Alarm
28 31 00 - Fire Detection and Alarm
28 31 13 - Fire Detection and Alarm Control, GUI, and Logic Systems
28 31 23 - Fire Detection and Alarm Annunciation Panels and Fire Stations
28 31 33 - Fire Detection and Alarm Interfaces
28 31 33.13 - Fire Detection and Alarm Interfaces to Remote Monitoring
28 31 33.26 - Fire Detection and Alarm Interfaces to Intrusion Detection
28 31 33.43 - Fire Detection and Alarm Interfaces to Elevator Control
28 31 43 - Fire Detection Sensors
28 31 46 - Smoke Detection Sensors
28 31 49 - Carbon-Monoxide Detection Sensors
28 31 53 - Fire Alarm Initiating Devices
28 31 53.13 - Fire Alarm Pull Stations
28 31 53.23 - Fire Alarm Level Detectors Switches
28 31 53.33 - Fire Alarm Flow Switches
28 31 53.43 - Fire Alarm Pressure Sensors
28 31 63 - Fire Alarm Integrated Audio Visual Evacuation Systems
28 31 63.13 - Fire Alarm Horns and Strobes
28 32 00 - Radiation Detection and Alarm
28 32 13 - Radiation Detection and Alarm Control, GUI, and Logic Systems
28 32 23 - Radiation Detection and Alarm Integrated Audio Evacuation Systems
28 32 33 - Radiation and Alarm Detection Sensors
28 32 43 - Radiation and Alarm Dosimeters
28 33 00 - Fuel-Gas Detection and Alarm
28 33 13 - Fuel-Gas Detection and Alarm Control, GUI, and Logic Systems
28 33 23 - Fuel-Gas Detection and Alarm Integrated Audio Evacuation Systems
28 33 33 - Fuel-Gas Detection Sensors
28 34 00 - Fuel-Oil Detection and Alarm
28 34 13 - Fuel-Oil Detection and Alarm Control, GUI, and Logic Systems
28 34 23 - Fuel-Oil Detection and Alarm Integrated Audio Evacuation Systems
28 34 33 - Fuel-Oil Detection Sensors
31 00 00 - Earthwork
31 08 00 - Commissioning of Earthwork
31 08 00.00.01 - Commissioning of Earthwork
31 09 00 - Geotechnical Instrumentation and Monitoring of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
31 21 00 - Off-Gassing Mitigation
31 21 16.13 - Methane Venting
32 00 00 - Exterior Improvements
32 08 00 - Commissioning of Exterior Improvements
32 08 00.00.01 - Commissioning of Exterior Improvements
33 00 00 - Utilities
33 01 00 - Operation and Maintenance of Utilities
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 00 - Schedules for Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 08 00 - Commissioning of Utilities
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
33 09 00 - Instrumentation and Control for Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 11 00 - Water Utility Distribution Piping
33 11 16 - Site Water Utility Distribution Piping
33 11 19 - Fire Suppression Utility Water Distribution Piping
33 12 00 - Water Utility Distribution Equipment
33 12 19 - Water Utility Distribution Fire Hydrants
33 29 00 - Well Abandonment
33 29 00.00.01 - Well Abandonment
33 33 00 - Low Pressure Utility Sewerage
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 00 - Sanitary Utility Sewerage Force Mains
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 00 - Storm Utility Drainage Piping
33 41 13 - Public Storm Utility Drainage Piping
33 50 00 - Fuel Distribution Utilities
33 50 00.00.01 - Fuel Distribution Utilities
33 51 00 - Natural-Gas Distribution
33 51 13 - Natural-Gas Piping
33 60 00 - Hydronic and Steam Energy Utilities
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 00 - Hydronic Energy Distribution
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 00 - Steam Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00 - Electrical Utilities
33 70 00.00.01 - Electrical Utilities
33 71 00 - Electrical Utility Transmission and Distribution
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 00 - Site Grounding
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 00 00 - Transportation
34 08 00 - Commissioning of Transportation
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
35 00 00 - Waterway & Marine Construction
35 08 00 - Commissioning of Waterway and Marine Construction
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 00 00 - Process Integration
40 23 00 - Water Process Piping
40 23 36 - Sanitary Water Process Piping
40 80 00 - Commissioning of Process Systems
40 80 00.00.01 - Commissioning of Process Systems
41 00 00 - Material Processing & Handling Equipment
41 08 00 - Commissioning of Material Processing and Handling Equipment
41 08 30 - Commissioning of Manufacturing Equipment
42 00 00 - Process Heating, Cooling, & Drying Equipment
42 08 00 - Commissioning of Process Heating, Cooling, and Drying Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 00 00 - Process Gas & Liquid Handling, Purification....
43 08 00 - Commissioning of Process Gas and Liquid Handling, Purification, and Storage Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 00 00 - Pollution Control Equipment
44 08 00 - Commissioning of Pollution Control Equipment
44 08 40 - Commissioning Water Treatment Equipment
45 00 00 - Industry-Specific Manufacturing Equipment
45 08 00 - Commissioning of Industry-Specific Manufacturing Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 00 00 - Electrical Power Generation
48 08 00 - Commissioning of Electrical Power Generation
48 08 00.00.01 - Commissioning of Electrical Power Generation