Logo

Crowder Construction Co.

Share

Apex, NC 27539

Company Info

  • Est. 1947
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

EPC Combustion Gas Turbine Installation

Project Information

Project Location:
NC
Status:
Completed
Structure Type:
Non-Building Construction

References

Owner:
Crowder Construction Co.

Scope Of Work

Scope of work consisted of two GE LM6000 natural gas combustion turbines that can produce a total of 90 MW of power, along with the balance of associated plant equipment. This included two field-erected treated water storage tanks, 10’ diameter by 60’ tall exhaust stacks with Higgot Kane anti-icing systems on each unit, a common electrical building, a pump house which houses the compressed air equipment and water forwarding pumps, and an administration building. The two single-cycle combustion units Crowder installed were added to the existing 625 MW combined-cycle turbines, providing fast-start, emergency power to the electrical grid. Crowder self-performed all civil, mechanical, electrical, instrumentation, and millwright services. We also utilized in-house fabrication capabilities for various pipe racks, supports and platforms.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/360602/crowder-construction-co/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.