Logo

GSE Construction, Inc.

Share

Livermore, CA 94551

Company Info

  • Est. 1980
  • Size 250-499 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

El Dorado Hills WWTP

Project Information

Project Location:
El Dorado Hills, CA
Approx Contract:
$60,000,000
Status:
Completed - Jan 2010
Structure Type:
Sewage / Water Treatment Plant

References

Owner:
El Dorado Irrigation District

Scope Of Work

Expansion of the existing WWTP’s average dry weather flow from 3.0 mgd to 5.4 mgd and to comply with future permit requirements. Major construction included lowering the 66 MGAL Storage Reservoir for the construction of the Reservoir Effluent Pump Station, blasting rock, and bypasses to keep the WWTP operational at all times.

 

The project also included construction of a New Admin Building, Pre-Engineered Metal Building, and Masonry buildings; Installation of two Seimens Trident Filters; UV Controls & RMSB Bldg, Secondary Effluent Pump Station #2, Digester Control Bldg and EQ Pump Station; Construction of concrete structures, expanded Headworks, Disinfection Splitter Box, Modified Mixed Liquor Flow Split Structure, Algae DAF #2, UV Disinfection Facility, Reservoir Effluent Pump Station, and two new Welded Steel Equalization Tanks. New equipment and piping included a Gas Flare System; Hot Water Boiler and Heat Exchange System; Biofilter FRP ducting and Fan Stations;  A complete UV System; pumps, Headworks screening and conveying equipment; Diesel Emergency Generators with ATS’s; Electrical, Controls, SCADA and Instrumentation; new Yard Piping and Electrical Ductbank.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/360737/gse-construction-inc/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.