Land O’ Lakes Ph Neutralization System & Truck Scales Facility

Project Information

Project Location:
Tulare, CA
Approx Contract:
$6,000,000
Status:
Completed - Jan 2016
Structure Type:
Manufacturing Plant

References

Owner:
Land O’ Lakes

Scope Of Work

Construction of a 2.2 MGD pH neutralization system built to control the large pH range of the plant effluent, pH 2-13. This included a 25’ deep epoxy lined cast-in-place wet well with dual 2000gpm SST submersible pumps, which moved the effluent into two 200,000 gallon neutralization tanks. Multiple new chemical dosing pumps supplied the acid/bases to neutralize the effluent before it entered the city sewer system. The effluent was moved through all SST pipe above ground and fusion welded HDPE below ground.  A fully containerized MMC room was set by crane and anchored on its own slab.

Concurrently with the pH Neutralization system a new Truck Scale system was constructed. Three new, 10’x70’, at grade truck scales were constructed to optimize inflow of dairy trucks. The job included a two-story CMU building, housing security and the sampling laboratory.  A pre-manufactured catwalk system, including access platforms to the tops of the dairy trucks, was built to quickly sample each dairy truck. A large metal structure with standing seam roof  was included.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/360737/gse-construction-inc/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.