Kostmayer Construction

Slidell, LA 70458

Home Contact Us

Company Info

  • Size 50-99 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Piping System For Petrochemical Liquids Terminal

Project Information

Project Location:
Slidell, LA
Status:
Completed
Structure Type:
Misc Project

Scope Of Work

Kostmayer installed four product mechanical pipes and pipe rack that span 1.5 miles over a wetland area from the storage facility to a marine loading/off-loading facility on the Mississippi River. Three of the pipes required a directional boring installation under an in-service railway and the fourth pipe crossed over the railway via an existing pipe bridge. Kostmayer fabricated “pig traps” onsite for pipe cleaning, valuing, and line purging system. We utilized both X-Ray and Die Pen as non-destructive testing for pipe welds that met standards for the American Petroleum Institute and the completed system was hydrotested and with results recorded in real time.

Project Images

#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/386628/kostmayer-construction/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.