Featured Project Return to Projects List

PBF Energy-Chalmette Refining

Project Information

Project Location:
LA
Status:
Completed - Jan 2018
Structure Type:
Misc Project

References

Client:
PBF Energy

Scope Of Work

Boh Bros. was hired by PBF  to construct  tank foundation for  new crude oil tank D03011 at  Chalmette Refinery.  pile-supported foundation is 302’  diameter  2’ thick  is  largest diameter foundation Boh has ever .

Following initial sitework, Boh sequenced three piling rigs to work simultaneously in order to ensure a safe  efficient   while driving  1,485 14”x70’ pre-stressed concrete piles required for  foundation. After driving piles, 1,021,648lbs (510 TN)  re-steel was tied into  foundation.

A total  5,250 cubic yards  concrete was then placed into the tank foundation in two pours  2,625 CY on subsequent weekends. Boh Bros.   foundation 32 calendar days after  pile driving had been .

Project Images

#
#
#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/395064/boh-bros-construction-co-llc/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.