W.M. Lyles Co.
Fresno, CA 93744
Featured Project Return to Projects List
Central Contra Costa Sanitary District, Treatment Plant Piping Renovations Phases 8 & 9
Project Information
- Project Location:
- Martinez, CA
- Approx Contract:
- $40,000,000
- Status:
- Completed - Sep 2019
- Structure Type:
- Sewage / Water Treatment Plant
Scope Of Work
The work generally consisted of preventative maintenance and upgrades to several process equipment and piping systems throughout the treatment facility.
Phase 8 items included replacement of four Scum Pumps at the Secondary Clarifiers, an existing FRP Hypochlorite Tank, one strainer cover and motor, 300 LF of 3” & 4” piping for the plant boilers in the Solids Handling Building, two actuators and pedestals for existing 36” gates at the Clearwell, 1,000 LF of spray water piping, supports, and spray nozzles at the Aeration Tank and Mixed Liquor Channel, seven boiler pressure instruments and tubing, modifications to existing steel 2W, 3WLP, and DAF piping at the Backwash Pumps and other locations, demolition of existing fire suppression system, and hazardous material abatement at multiple locations.