W.M. Lyles Co.

Fresno, CA 93744

Company Info

  • Est. 1945
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Chino Basin Desalter Authority, Chino II Desalter Concentration Reduction Facility

Project Information

Project Location:
Jurupa Valley, CA
Approx Contract:
$50,000,000
Status:
Completed - Jul 2017
Structure Type:
Sewage / Water Treatment Plant

References

Owner:
Chino Basin Desalter Authority

Scope Of Work

Upgrade of existing 13 MGD water filtration plant to 25 MGD. In addition, reject flows of 1.2 MGD for the existing plant were reduced to 0.6 MGD with the new facilities. Sequential improvements were completed and coordinated with plant staff to ensure that existing facilities remained fully functional during construction. Improvements included cartridge filters, reverse osmosis (RO) feed pumps and CSM high rejection RO element membranes, decarbonators, ion exchange vessels, softened water storage tanks, a salt storage tank, pellet seed storage and feed systems, centrifuges and solids material conveyors, bag filters, sludge pumps, submersible pumps, a multi-stage centrifugal blower system, energy recovery turbines, vertical turbine pumps, transfer pumps, a storage building, monorail crane systems, a compressed air system, clean-in-place (CIP) systems, a hydrochloric acid station, chemical feed pumps and blending systems, gravity thickeners and filters, clarifiers, a pre-engineered metal building, a three-story structural steel dewatering facility, site piping, safety and security systems, and electrical instrumentation and controls with SCADA integration.

Project Images

#
#
Share URL copied!
https://www.thebluebook.com/iProView/398329/w-m-lyles-co/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.