W.M. Lyles Co.

Fresno, CA 93744

Company Info

  • Est. 1945
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Rialto Groundwater Wellhead Treatment System Project

Project Information

Project Location:
Rialto, CA
Status:
Completed
Structure Type:
Sewage / Water Treatment Plant

Scope Of Work

The new 2.8 MGD Water Treatment Plant is designed to remove perchlorate from groundwater through a biological degradation process. This featured technology uses suspended bacteria to consume salt anions within a fluidized bed reactor (FBR) treatment system. After the FBR’s, the process follows the stages of a traditional plant including aeration tanks, Trident filters, a dissolved air flotation (DAF) unit and additional process equipment. Construction also included the excavation and haul off of contaminated material, two underground concrete tanks, concrete slabs-on-grade, masonry structures, a pre-engineered metal treatment building and all the associated piping, electrical, and controls.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/398329/w-m-lyles-co/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.