Engineers Construction

WILLISTON, VT 05495

People Also View These
Loading...

Our Story

Our main lines of business include: Boring--Horizontal, Contractors, Marine Construction, Paving Contractors, Pipeline Contractors, Railroad Track Construction, Retaining Wall Systems.

Engineers Construction has been listed in the Blue Book since 2010.

What We Do

  • Boring--Horizontal, Contractors
  • Marine Construction
  • Paving Contractors
  • Pipeline Contractors
  • Railroad Track Construction
  • Retaining Wall Systems
  • Road Construction--Heavy & Highway
  • Sewer Contractors
  • Site Development
  • Underground Utilities--Contractors
  • Water Main Construction

Regions & Counties Serviced

  • Maine, Vermont

Vermont 1

  • Chittenden

Our CSI Codes

01 53 26 - Temporary Runarounds
01 55 19 - Temporary Parking Areas
01 55 23 - Temporary Roads
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 06 30.13 - Boring or Test Pit Log Schedule
02 32 19 - Exploratory Excavations
02 41 13.33 - Railtrack Removal
02 58 16 - Snow Avalanche Control
03 37 23 - Roller-Compacted Concrete
06 01 80.51 - Composite Cleaning
06 01 80.91 - Composite Restoration
06 13 33 - Heavy Timber Pier Construction
22 13 13 - Facility Sanitary Sewers
22 13 16 - Sanitary Waste and Vent Piping
22 13 19 - Sanitary Waste Piping Specialties
22 14 13 - Facility Storm Drainage Piping
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 14 13.23 - Topsoil Stripping and Stockpiling
31 21 16.13 - Methane Venting
31 22 16.13 - Roadway Subgrade Reshaping
31 23 13 - Subgrade Preparation
31 30 00.00.01 - Earthwork Methods
31 53 13 - Timber Cribwork
31 63 19.13 - Rock Sockets for Piles
31 77 13 - Trench Excavation for Submerged Tunnels
31 77 19 - Floating and Laying Submerged Tunnels
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.62 - Concrete Paving Raising
32 01 30 - Operation and Maintenance of Site Improvements
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 06 30 - Schedules for Site Improvements
32 06 30.13 - Retaining Wall Schedule
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 12 13.23 - Asphaltic Prime Coats
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
32 30 00.00.01 - Site Improvements
32 32 13 - Cast-in-Place Concrete Retaining Walls
32 32 16 - Precast Concrete Retaining Walls
32 32 19 - Unit Masonry Retaining Walls
32 32 23 - Segmental Retaining Walls
32 32 23.13 - Segmental Concrete Unit Masonry Retaining Walls
32 32 26 - Metal Crib Retaining Walls
32 32 29 - Timber Retaining Walls
32 32 36 - Gabion Retaining Walls
32 32 43 - Soldier-Beam Retaining Walls
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 10 - Operation and Maintenance of Water Utilities
33 01 30 - Operation and Maintenance of Sewer Utilities
33 01 30.51 - Maintenance of Sewer Utilities
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 05 13.13 - Manhole Grade Adjustment
33 05 23 - Trenchless Utility Installation
33 05 23.13 - Utility Horizontal Directional Drilling
33 05 23.16 - Utility Pipe Jacking
33 05 23.19 - Microtunneling
33 05 23.23 - Utility Pipe Ramming
33 05 23.26 - Utility Impact Moling
33 05 23.29 - Cable Trenching and Plowing
33 06 10 - Schedules for Water Utilities
33 06 30 - Schedules for Sanitary Sewerage Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 50 - Schedules for Fuel Distribution Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 06 80 - Schedules for Communications Utilities
33 09 10 - Instrumentation and Control for Water Utilities
33 09 30 - Instrumentation and Control for Sanitary Sewerage Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 50 - Instrumentation and Control for Fuel Distribution Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 09 80 - Instrumentation and Control for Communications Utilities
33 10 00.00.01 - Water Utilities
33 11 13 - Public Water Utility Distribution Piping
33 11 16 - Site Water Utility Distribution Piping
33 29 00.00.01 - Well Abandonment
33 30 00.00.01 - Sanitary Sewerage Utilities
33 31 13 - Public Sanitary Utility Sewerage Piping
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 01 13 - Operation and Maintenance of Roadways
34 01 23 - Operation and Maintenance of Railways
34 01 23.13 - Track Removal and Salvage
34 01 23.81 - Track Crosstie Replacement
34 01 33 - Operation and Maintenance of Airfields
34 01 43 - Operation and Maintenance of Bridges
34 05 13 - Common Work Results for Roadways
34 05 23 - Common Work Results for Railways
34 05 33 - Common Work Results for Airports
34 05 43 - Common Work Results for Bridges
34 06 13 - Schedules for Roadways
34 06 23 - Schedules for Railways
34 06 33 - Schedules for Airfields
34 06 43 - Schedules for Bridges
34 10 00.00.01 - Guideways/Railways
34 11 13 - Track Rails
34 11 13.13 - Light Rail Track
34 11 13.23 - Heavy Rail Track
34 11 16 - Welded Track Rails
34 11 16.13 - In-Track Butt-Welded Track Rail
34 11 16.16 - Pressure-Welded Track Rail
34 11 16.19 - Thermite-Welded Track Rail
34 11 19 - Track Rail Joints
34 11 23 - Special Trackwork
34 11 23.13 - Ballasted Special Track Rail
34 11 23.23 - Running Rail
34 11 23.26 - Precurved Running Rail
34 11 26 - Ballasted Track Rail
34 11 29 - Embedded Track Rail
34 12 13 - Elevated Monorails
34 12 16 - On-Grade Monorails
34 12 19 - Below-Grade Monorails
34 12 63 - Monorail Track
34 13 13 - Inclined Railway
34 14 19 - Gondolas
34 14 53 - Cable Car Systems
34 70 00.00.01 - Transportation Construction and Equipment
35 01 30 - Operation and Maintenance of Coastal Construction
35 01 40 - Operation and Maintenance of Waterway Construction
35 01 40.92 - Preservation of Water Courses
35 01 50 - Operation and Maintenance of Marine Construction
35 05 30 - Common Work Results for Coastal Construction
35 05 50 - Common Work Results for Marine Construction
35 06 30 - Schedules for Coastal Construction
35 06 50 - Schedules for Marine Construction
35 12 33 - Marine Navigation Equipment
35 20 13.16 - Hydraulic Bulkheads
35 20 13.19 - Hydraulic Manifolds
35 20 13.23 - Hydraulic Penstocks
35 20 13.26 - Hydraulic Trashracks
35 20 16 - Hydraulic Gates
35 20 16.13 - Hydraulic Spillway Crest Gates
35 20 16.19 - Hydraulic Head Gates
35 20 16.26 - Hydraulic Sluice Gates
35 20 16.33 - Hydraulic Miter Gates
35 20 16.39 - Hydraulic Sector Gates
35 20 16.46 - Hydraulic Tainter Gates and Anchorages
35 20 16.53 - Hydraulic Vertical Lift Gates
35 20 16.59 - Hydraulic Closure Gates
35 30 00.00.01 - Coastal Construction
35 31 16 - Seawalls
35 31 16.13 - Concrete Seawalls
35 31 16.16 - Segmental Seawalls
35 31 16.19 - Steel Sheet Piling Seawalls
35 31 16.23 - Timber Seawalls
35 31 16.40 - Stone Seawalls
35 31 19 - Revetments
35 31 19.13 - Sacked Cement-Sand Revetments
35 31 19.16 - Concrete Unit Masonry Revetments
35 31 19.40 - Stone Revetments
35 31 23 - Breakwaters
35 31 23.13 - Rubble Mound Breakwaters
35 31 23.16 - Precast Breakwater Modules
35 31 26 - Jetties
35 31 26.13 - Concrete Jetties
35 31 26.16 - Concrete Unit Masonry Jetties
35 31 26.40 - Stone Jetties
35 31 29 - Groins
35 31 29.13 - Concrete Groins
35 31 29.16 - Concrete Unit Masonry Groins
35 31 29.26 - Steel Groins
35 32 13 - Scrap Material Artificial Reefs
35 32 13.13 - Scrap Concrete Artificial Reefs
35 32 13.33 - Sunken Ship Artificial Reefs
35 32 16 - Constructed Artificial Reefs
35 32 16.13 - Constructed Concrete Artificial Reefs
35 32 16.19 - Constructed Steel Artificial Reefs
35 40 00.00.01 - Waterway Construction and Equipment
35 42 37 - Riprap Bank Protection
35 42 53 - Wall Bank Protection
35 42 53.16 - Concrete Unit Masonry Wall Bank Protection
35 42 53.19 - Segmental Wall Bank Protection
35 42 53.40 - Stone Wall Bank Protection
35 43 37 - Riprap Scour Protection
35 43 53 - Wall Scour Protection
35 43 53.13 - Concrete Unit Masonry Wall Scour Protection
35 43 53.16 - Segmental Wall Scour Protection
35 43 53.40 - Stone Wall Scour Protection
35 49 23 - Waterway Locks
35 49 23.13 - Concrete Waterway Locks
35 49 23.23 - Piling Waterway Locks
35 50 00.00.01 - Marine Construction and Equipment
35 51 13 - Floating Piers
35 51 13.23 - Floating Wood Piers
35 51 13.26 - Floating Plastic Piers
35 51 23 - Pontoons
35 52 13 - Fixed Offshore Platform Construction
35 52 33 - Floating Offshore Platform Construction
35 53 33 - Underwater Pipeline Construction
35 59 13 - Marine Fenders
35 59 13.16 - Resilient Foam-Filled Marine Fenders
35 59 13.19 - Rubber Marine Fenders
35 59 23 - Buoys
35 59 23.13 - Mooring Buoys
35 59 23.16 - Anchor Pendant Buoys
35 59 23.19 - Navigation Buoys
35 59 29 - Mooring Devices
35 59 29.16 - Laser Docking Systems
35 71 19 - Rockfill Gravity Dams
35 73 13 - Earth Embankment Dam
35 73 16 - Rock Embankment Dams
35 79 13 - Fish Ladders
35 79 13.13 - Concrete Fish Ladders
40 23 36 - Sanitary Water Process Piping
43 01 10 - Operation and Maintenance of Gas Handling Equipment
43 01 20 - Operation and Maintenance of Liquid Handling Equipment

Gallery

Featured Image 1
We are located in Chittenden County.

Associations & Memberships

AGC (Associated General Contractors)
AGC (Associated General Contractors)
Share URL copied!
https://www.thebluebook.com/iProView/439759/engineers-construction/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.