Featured Project Return to Projects List
ADM Sweetener Distribution Terminal
Project Information
- Project Location:
- Lodi, CA
- Status:
- In-Progress
- Structure Type:
- Industrial Maintenance
Scope Of Work
Diede served as design-build contractor for Archer Daniels Midland Corporation sweetener distribution terminal in Lodi, California. terminal is used to store, blend ship food-grade sweeteners. Sweeteners handled at include corn syrup, high-fructose corn syrup sucrose for use carbonated beverages, fruit canning, ice cream, jams, jellies, other food beverage applications.
Design-build consisted of 13,500 square feet of metal buildings to house sweetener boiler, truck scales, truck loading equipment, truck wash operation personnel offices, including quality laboratories. Design-assist scope of included grading, underground utilities, freight car rails unloading equipment, tank farm, process piping equipment. Diede self-performed all concrete including heavy vehicle drive , foundations for tank farms metal buildings. DDC also handled erection of metal buildings.