Logo

Marine Technologies, Inc.

Baltimore, MD 21226

Company Info

  • Est. 1992
  • Size 50-99 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Lot 304 Drainage Improvements Dundalk Marine Terminal

Project Information

Project Location:
Baltimore, MD
Approx Contract:
$5,000,000
Status:
Completed - Apr 2016
Structure Type:
Marine

References

Owner:
Maryland Port Administration
General Contractor:
Marine Technologies, Inc.

Scope Of Work

Project consisted of the construction of an underground, cast-in-place concrete vault, measuring approximately 90'x90'x12' deep to both treat and store surface storm water drainage.  The vault includes a pretreatment area, sand filter, overflow storage area, and pump station/wet well.  The pump station consists of four pumps: two 5-horsepower and two 35-horsepower.  The pumps discharge into Colgate Creek at Berth 1 via 4,100 feet of 14" HDPE force main pipe.  Manholes are located along the force main alignment to provide both air release valves and flushing connections.  Power to the pump system is provided by an upgraded existing transformer and new breaker pane. Back-up power is provided by an 80KW diesel powered generator.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/795625/marine-technologies-inc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.