01 00 00 - General Requirements
01 35 00 - Special Procedures
01 35 16 - Alteration Project Procedures
01 73 00 - Execution
01 73 29 - Cutting and Patching
01 89 00 - Site Construction Performance Requirements
01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 00 00 - Existing Conditions
02 01 00 - Maintenance of Existing Conditions
02 01 50 - Maintenance of Site Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 06 00 - Schedules for Existing Conditions
02 06 50 - Schedules for Site Remediation
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 25 00 - Existing Material Assessment
02 25 19.13 - Masonry Assessment Drilling
02 26 00 - Hazardous Material Assessment
02 26 36 - Hazardous Waste Drum Assessment
02 32 00 - Geotechnical Investigations
02 32 19 - Exploratory Excavations
02 50 00 - Site Remediation
02 50 00.00.01 - Site Remediation
02 51 00 - Physical Decontamination
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 52 00 - Chemical Decontamination
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 00 - Thermal Decontamination
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 00 - Biological Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 55 00 - Remediation Soil Stabilization
02 55 00.00.01 - Remediation Soil Stabilization
02 56 00 - Site Containment
02 56 13 - Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 58 00 - Snow Control
02 58 16 - Snow Avalanche Control
02 60 00 - Contaminated Site Material Removal
02 60 00.00.01 - Contaminated Site Material Removal
02 61 00 - Removal and Disposal of Contaminated Soils
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 00 - Hazardous Waste Recovery Processes
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 72 00 - Water Decontamination
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 81 00 - Transportation and Disposal of Hazardous Materials
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 84 00 - Polychlorinate Biphenyl Remediation
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 86 00 - Hazardous Waste Drum Handling
02 86 00.00.01 - Hazardous Waste Drum Handling
03 00 00 - Concrete
03 01 00 - Maintenance of Concrete
03 01 80 - Maintenance of Concrete Cutting and Boring
03 06 00 - Schedules for Concrete
03 06 80 - Schedules for Concrete Cutting and Boring
03 80 00 - Concrete Cutting and Boring
03 80 00.00.01 - Concrete Cutting and Boring
03 81 00 - Concrete Cutting
03 81 13 - Flat Concrete Sawing
03 81 16 - Track Mounted Concrete Wall Sawing
03 81 19 - Wire Concrete Wall Sawing
03 81 23 - Hand Concrete Wall Sawing
03 81 26 - Chain Concrete Wall Sawing
03 82 00 - Concrete Boring
03 82 13 - Concrete Core Drilling
11 00 00 - Equipment
11 92 00 - Agricultural Equipment
11 92 23 - Agricultural Waste Clean-Up Equipment
23 00 00 - Heating, Ventilating, & Air Conditioning
23 01 00 - Operation and Maintenance of HVAC Systems
23 01 60.71 - Refrigerant Recovery/Recycling
31 00 00 - Earthwork
31 01 00 - Maintenance of Earthwork
31 01 10 - Maintenance of Clearing
31 01 20 - Maintenance of Earth Moving
31 01 50 - Maintenance of Excavation Support and Protection
31 06 00 - Schedules for Earthwork
31 06 10 - Schedules for Clearing
31 06 20 - Schedules for Earth Moving
31 06 20.13 - Trench Dimension Schedule
31 10 00 - Site Clearing
31 10 00.00.01 - Site Clearing
31 11 00 - Clearing and Grubbing
31 11 00.00.01 - Clearing and Grubbing
31 12 00 - Selective Clearing
31 12 00.00.01 - Selective Clearing
31 14 00 - Earth Stripping and Stockpiling
31 14 13 - Soil Stripping and Stockpiling
31 14 13.13 - Soil Stripping
31 14 13.16 - Soil Stockpiling
31 14 13.23 - Topsoil Stripping and Stockpiling
31 14 16 - Sod Stripping and Stockpiling
31 14 16.13 - Sod Stripping
31 14 16.16 - Sod Stockpiling
31 20 00 - Earth Moving
31 20 00.00.01 - Earth Moving
31 22 00 - Grading
31 22 13 - Rough Grading
31 22 16 - Fine Grading
31 22 19 - Finish Grading
31 22 19.13 - Spreading and Grading Topsoil
31 23 00 - Excavation and Fill
31 23 13 - Subgrade Preparation
31 23 16 - Excavation
31 23 16.13 - Trenching
31 23 16.16 - Structural Excavation for Minor Structures
31 23 16.26 - Rock Removal
31 23 33 - Trenching and Backfilling
31 30 00 - Earthwork Methods
31 30 00.00.01 - Earthwork Methods
32 00 00 - Exterior Improvements
32 01 00 - Operation and Maintenance of Exterior Improvements
32 01 30 - Operation and Maintenance of Site Improvements
32 06 00 - Schedules for Exterior Improvements
32 06 30 - Schedules for Site Improvements
32 30 00 - Site Improvements
32 30 00.00.01 - Site Improvements
32 71 00 - Constructed Wetlands
32 71 00.00.01 - Constructed Wetlands
32 72 00 - Wetlands Restoration
32 72 00.00.01 - Wetlands Restoration
33 00 00 - Utilities
33 06 00 - Schedules for Utilities
33 06 50 - Schedules for Fuel Distribution Utilities
33 09 00 - Instrumentation and Control for Utilities
33 09 50 - Instrumentation and Control for Fuel Distribution Utilities
33 47 00 - Ponds and Reservoirs
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
35 00 00 - Waterway & Marine Construction
35 41 00 - Levees
35 41 16 - Levee Cutoff Trenches
35 53 00 - Underwater Construction
35 53 33 - Underwater Pipeline Construction
35 73 00 - Embankment Dams
35 73 13 - Earth Embankment Dam
43 00 00 - Process Gas & Liquid Handling, Purification....
43 01 00 - Operation and Maintenance of Process Gas and Liquid Handling, Purification, and Storage Equipment
43 01 10 - Operation and Maintenance of Gas Handling Equipment
43 01 20 - Operation and Maintenance of Liquid Handling Equipment