Logo

EMCOR Services ARC

Fresno, CA 93726

Company Info

  • Est. 1983
  • Size 500+ Employees
  • Annual Vol Undisclosed
  • DUNS # 11-838-6309

Featured Project Return to Projects List

County of Tulare- CT Installations & Modernization

Project Information

Project Location:
Visalia, CA
Approx Contract:
$300,000
Status:
Completed - Jul 2017
Structure Type:
Government

References

Owner:
County of Tulare
General Contractor:
Mesa Energy Systems
Client:
Kyle Taylor - Capital Projects Coordinator
(559) 636-5303
County of Tulare

Scope Of Work


  •  

Administration Building

  • Isolate power to existing Cooling tower.
  • Disconnect all piping, electrical and other utilities.
  • Prep old tower for removal.
  • Provide required crane service to remove and set tower.
  • Provide new BAC tower of same size and capacity and set in same location modify existing supports to accept new tower.
  • Provide new piping from POC to new tower.
  • Provide new Water Treatment controller, pumps and drain valve.
  • Reconnect electrical and controls to new tower.
  • Perform start-up and testing on new tower. 
  • Equipment has an estimated LEAD time of 6 weeks.

Old AG Building

  • Isolate power to existing Cooling tower.
  • Disconnect all piping, electrical and other utilities.
  • Prep old tower for removal.
  • Provide required crane service to remove and set tower.
  • Provide new BAC tower of same size and capacity and set in same location modify existing supports to accept new tower.
  • Provide new piping from POC to new tower.
  • Provide new Water Treatment controller, pumps and drain valve.
  • Reconnect electrical and controls to new tower.
  • Provide and install new chain link fence enclosure around tower area.
  • Perform start-up and testing on new tower. 
  • Equipment has an estimated LEAD time of 6 weeks.

County Council Building-New Tower Install

  • Building has no cooling tower currently.  So our scope is to provide and install a BAC tower sized to meet the needs of the existing water cooled chiller in basement.
  • Provide all new piping, electrical and other utilities from building to new tower location.
  • Provide trenching from building out to new tower location.
  • Provide new VFD for new tower fan.
  • Provide new Tower integration controls for adequate operation.
  • Provide new concrete pad for new tower, location to be agreed upon by County personnel and EMCOR.
  • Provide and install new chain link fence enclosure around tower area.
  • Provide new Water Treatment controller, chemicals, pumps and drain valve.
  • Perform start-up and testing on new tower. 
  • Equipment has an estimated LEAD time of 6 weeks.

Education Building

  • Building has no cooling tower currently.  So our scope is to provide and install a BAC tower sized to meet the needs of the existing water cooled equipment on roof plus 30% added capacity for future.
  • Provide all new electrical and other utilities from building to new tower location.
  • Provide new piping from new tower location to POC at exterior wall per shown on plans.
  • Provide new return piping from MZ1 at West roof location to POC at exterior wall.
  • Provide trenching from building out to new tower location.
  • Provide new VFD for new tower fan.
  • Provide new Tower integration controls for adequate operation and to prevent overflowing of tower during shut down.
  • Provide new concrete pad for new tower, location to be agreed upon by County personnel and EMCOR.
  • Provide and install new chain link fence enclosure around tower area.
  • Provide new Water Treatment controller, chemicals, pumps and drain valve.
  • Perform start-up and testing on new tower. 
  • Equipment has an estimated LEAD time of 6 weeks.

Project Images

#
#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/810909/emcor-services-arc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.