161 VAN WAGENEN AVE
Project Information
- Project Location:
- JERSEY CITY, NJ
- Status:
- Completed - May 2024
- Structure Type:
- Apartments & Condominiums
References
- Owner:
- GN MANAGEMENT INC.
- Architect:
- ARCHITECTURA
- General Contractor:
- HIGHRISE CONSTRUCTION SOLUTION INC.
Scope Of Work
CMU BLOCK INSTALLATION
- Install 8”x8”x16” CMU block at cellar, ground floor, mezzanine, parapets, elevator doors and elevator bulkhead as per specs.
- Install 8”x8”x16” split face CMU (one side) at second floor parapet as per spces.
- Install 12”x8”x16” CMU block at ground floor exterior walls as per specs.
- Install horizontal reinforcement galvanized truss type @16” O.C. as per specs (Sheet s001).
- Install #6 rebars @16” O.C. at 12” CMU walls (S-304) and #5 @48 O.C. at 8” CMU walls and 1 #5 at corners as per specs. (Schedule shown at structural drawings S-001 and S-400).
- Fill block at reinforcing with 3,000 psi grout (structural drawings page S-001).
- Install concrete lintels over doors (if required) as per specs.
- Install bond beams at top of the floor with 2 continuous rebar #5 as per specs and grout block course above bond beams at top as per specs.
- Installation of PTA-422 partition top anchors @24” O.C. as per specs.
NOTE: CMU installation includes labor and material as per specs.
BRICK INSTALLATION
- Installation of 2” continuous rigid insulation (Labor only).
- Installation of TABS II panels system as per specs (Labor only).
- Installation of Thin Brick on panels as pers specs (Labor only).
- Wash brick with detergent as per specs.
- Installation of backer rod and caulking to all windows where brick is installed.
NOTE: This proposal includes labor only on thin brick installation (thin brick, panels, insulation, glue will be provided by GC/owner). The scaffolding will be installed by OTHERS.