PERI Formwork Systems, Inc.
Elkridge, MD 21075
Testimonials
“It was a huge benefit to receive fully assembled garage beam units from PERI. They strip easily, stay together well and move as big pieces through the building
to the next spot.”
“I love those ties – they’re awesome. The walls look really good when we strip the panels. There’s nothing left around the ties, and you save a lot of manpower.”
I successfully use PERI on most of my projects.
"Our project was one of the test-sites for DUO in the US, so we have been using the system for a few months already and are really happy. You can’t beat how simple and light it is."
“The PERI GRIDFLEX system is incredibly fast and easy. It has increased our productivity dramatically.”
I’ve been in concrete for 21 years and the PERI SKYDECK System is the best panel system out there. I highly recommend it. It’s fast and simple to put up and take down and leaves a clean and pretty product.
PERI successfully provided the solution for this highly complex task. In the course of the entire project, it was possible for us to react and deal with new situations almost daily using PERI UP.
“The lack of shoring rights on two sides of our project required a unique top-down construction method, and after reviewing multiple shoring systems, the PERI system stood apart from the group. Their team engaged in project meetings and engineered a series of tables which could be suspended from a steel superstructure above. PERI prefabricated the bulk of the large tables offsite, which really helped streamline the initial installation onsite, especially since our urban site had very limited laydown and storage space. Although the topdown sequence was unfamiliar to our team, the familiarity with PERI and their willingness to help overcome this unique challenge made the project a success.“
“The real benefit working with PERI was the excellent customer service and interaction with the team. Good logistics was important
because we do not have the lay down space. So it also helped that pieces and parts of the system are a minimum.”
“We love the system. It’s fast, safe and less wear and tear on the body.”
“Two other contractors had this project and turned it down. Baker was approached to do it and accepted the challenge. PERI took on this challenge with us. PERI was probably the only company that could have constructed and supplied the forms to us. It has been a very challenging project for both parties.”
Working in collaboration, PERI and Turner Construction designed the Traveling Mono System which has met scheduling and budgetary constraints. We've increased the level of safety for our workers as well as reduced the number of man hours required to set up traditional formwork systems. This system was specifically designed to pour concrete from the ground to the roof giving us ability to maximize our labor force and allow subcontractors to work beneath the system, all while improving on the quality of the finished product.
Working with the PERI Engineering Team, Largo Concrete Inc. was able to create a ‘project-specific’ solution to hand-set formwork on the perimeter edge of 1200 South Figueroa towers utilizing the PERI LPS Screen as an alternate method of protecting the perimeter areas of the typical tower floors.
„The PERI UP system is flexible and easy to work with, and it provides clean access to the work area. It is a light weight scaffold and easy to store the material in place. Overall it is the best material on the market.“
“PERI is and has been an effective, proactive partner in developing successful solutions for a very complex architecturally exposed feature structure on a highly visible project. PERI understood the challenges, and implemented a dedicated support team – engineering, sales, and field – that is a significant factor in Baker’s success on the structure. PERI’s team and orientation towards service makes us feel as if this project is their most important!”
Early experiences and the excellent working relationship with the PERI engineers made it an easy decision when it came to our choice of formwork supplier. With the PERI solution we have a formwork system on the site that enables us to work quickly and at a high quality.
The GARAGEDECK System was the right choice of formwork system for our project due to the minimal amount of parts and pieces. We were able to see similar projects before construction to gain knowledge of the system before we started. The preassembled beam forms reduced our labor requirements and saved space on the jobsite. PERI provided us with great service throughout the course of construction.
“The MAXIMO forms made a really clean pour, even the corners, and not having to put anyone inside the core to do the ties was awesome. It improves safety, plus you can have them do something else instead.”
The formwork provided by PERI for the dam, especially for the cantilevered spillway, was critical to the success of this remote project. Customer support and logistics were top notch in delivering formwork via a 5 day trip by barge.