Logo

Flatiron West, Inc.

Benicia, CA 94510

Company Info

  • Est. 1947
  • Size 500+ Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Calaveras Dam

Project Information

Project Location:
Sunol, CA
Approx Contract:
$300,000,000
Status:
In-Progress - Apr 2019
Structure Type:
Dams & Levies

Scope Of Work

A joint venture team of Dragados USA, Flatiron and Sukut Construction are responsible for constructing the new Calaveras Dam Replacement in Sunol, California. The project will replace the original dam, built in 1925, with a new 210-foot-high earth and rock fill dam designed to accommodate earthquakes on the Calaveras Fault. The project includes construction of a new 1,550-foot-long spillway utilizing 40,000-cubic-yards of concrete, construction of a new intake/outlet tower consisting of a 20-foot-diameter by 163-foot-deep vertical shaft and three new tunnels to convey water to and from the reservoir.

The new dam is constructed next to the original dam, which will be left in place and submerged underwater when the project is complete. The Calaveras Dam is part of the Hetch Hetchy Regional Water System that provides drinking water to 2.5 million people in Alameda, Santa Clara, San Mateo and San Francisco counties. Since 2001, after Calaveras Dam was deemed seismically unsafe by the California Division of Safety of Dams, water levels in the reservoir have remained at 40 percent of full capacity. The project will allow the water levels back to the historic capacity of 31 billion gallons.

The replacement project is part of the SFPUC’s $4.6 billion Water System Improvement Program to repair, replace, and seismically upgrade the aging pipelines, tunnels and reservoirs in the Hetch Hetchy Regional Water System.

Share URL copied!
https://www.thebluebook.com/iProView/930185/flatiron-west-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.