Harbor Bridge Replacement - US 181
Project Information
- Project Location:
- Corpus Christi, TX
- Approx Contract:
- $500,000,000
- Status:
- In-Progress - Apr 2020
- Structure Type:
- Bridge
Scope Of Work
The project involves the replacement of the current US 181 Harbor Bridge in Corpus Christi, Texas, along with a change in the alignment to interchange between US 181 and Interstate 37. The current bridge does not provide enough clearance for select ocean bound ships traveling to-and-from Corpus Christi Bay and the Port of Corpus Christi from the Gulf of Mexico.
Designed and constructed by Flatiron and Dragados in a joint venture, the new Harbor Bridge accommodates larger ships and will be the longest cable-stay bridge in the U.S. and Canada when completed. The old bridge will be demolished, making way for the new, six-lane bridge (3-lanes in each direction, as well as a bike/pedestrian path).
Its main span length is 1,661 feet and the base of each bridge tower is roughly the size of a basketball court. The length of the main span of the bridge is equivalent to the length of five and a half football fields and the bridge itself has more than 862 miles of strand in the cable-stays. Along with the bridge, the project also involves reconstruction of portions of US 181, I-37, and a nearby expressway. Overall, nearly 6.5 miles of bridge and connecting roadway will be designed and constructed.
The Record of Decision was published in January 2016. TxDOT entered into a four-party agreement with the City of Corpus Christi, the Federal Highway Administration, and the Port of Corpus Christi.