Logo

Cooper Chase Construction

Santa Maria, CA 93455

Company Info

  • Est. 2004
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Floor Coating Hangar 3 LNAS

Project Information

Project Location:
Lemoore, CA
Status:
Completed
Structure Type:
Terminal - Airport / Bus / Railroad

Scope Of Work

This project was located in Lemoore, CA at the Lemoore Naval Air Station for the United States Navy. It consisted of providing a new epoxy floor in an existing 61,000 square foot building in multiple phases. The work included abatement of the existing flooring system and removal and replacement of existing equipment. Each phase of the work was fully contained with an air filtration system that provided for six (6) air changes per hour. This was done to protect construction staff and Naval personnel from dust, debris and chemical inhalants. The epoxy floor system included a three (3) part epoxy system, multiple colors, logos and line delineation, all per Naval specifications.

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/968182/cooper-chase-construction/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.