Logo

Primus Builders, Inc.

Share

Woodstock, GA 30189

Company Info

  • Est. 2000
  • Size 100-249 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Valley Cold Storage

Project Information

Project Location:
Santa Teresa, NM
Status:
Completed
Structure Type:
Storage Facility / Warehouse

Scope Of Work

Primus provided design-build services on Phase I of the company’s first facility: conversion of a beverage distribution warehouse to a multi-temperature zone, public refrigerated warehouse that would serve as VCS’s first owner/operated facility. Phase 1 included a 32,000 SF freezer expansion, new refrigerated truck dock and multiple renovations to the existing cooler spaces.

VCS then added additional storage space and blast freezing capacity. Primus again provided design-build services. The Phase 2 building features include:

Multi-deep push back pallet racking

Shrink compensating floors

LED lighting system

New central refrigeration system

Blast freezers

The team elected to utilize a state-of-the art, CO2/NH3 Cascade refrigeration system. This system dramatically reduces the NH3 charge and uses CO2 within the warehouse spaces. This increases safety for both warehouse workers and product. The expandable system allows VCS to blast freeze 192,000 pounds of product per day while using up to 30% less energy than traditional NH3 systems.

VCS partnered with Primus a third time, this time on a 97,000 SF greenfield distribution facility in Santa Teresa, NM. This new facility features:

83,500 SF of storage space

5,000 SF office

First and second floor lobbies and a mezzanine

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/970772/primus-builders-inc/general-contractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.