Featured Project Return to Projects List

Wilde Lake Bulkhead Repair

Project Information

Project Location:
MD
Status:
Completed
Structure Type:
Sewage / Water Treatment Plant

Scope Of Work

 

The project involved the removal of a deteriorated timber bulkhead from within and along the edges of the lake and replacing same with a Pre-cast Stone bulkhead and pavers. Work included a new timber trellis, paving and re-landscaping disturbed areas. Water control was required to a depth of 6 feet and a length of 100 feet resulted in 24/7 dewatering operation.
Greenbridge provided the jobsite supervision and workforce for the day-to-day activities reported to the project manager.  Greenbridge assisted in the installation of the temporary 8’ x100’ water filled cofferdam, maintained the continuous dewatering of the construction area, installed over 500ft long by 11 ft high precast stone bulkhead with over 120 tons of gravel with geo-grid for structural support, rebuild banks with class-2 & 3 rip-rap, grade sediment in the dewatered lakebed. Installed 1500 lf of 5ft wide asphalt sidewalk, landscaped and reworked 7 acres of landscaping in the limits of construction area witch included grading, seeding, mulching, and planting of trees and shrubs, underwater construction of 48” concrete culvert wall.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/979382/greenbridge-construction/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.