01 00 00 - General Requirements
01 21 00 - Allowances
01 21 19 - Testing and Inspecting Allowances
01 35 00 - Special Procedures
01 35 13.43 - Special Project Procedures for Contaminated Sites
01 35 23 - Owner Safety Requirements
01 35 26 - Governmental Safety Requirements
01 35 29 - Health, Safety, and Emergency Response Procedures
01 35 29.13 - Health, Safety, and Emergency Response Procedures for Contaminated Sites
01 35 33 - Infection Control Procedures
01 35 43.13 - Environmental Procedures for Hazardous Materials
01 35 43.16 - Environmental Procedures for Toxic Materials
01 45 00 - Quality Control
01 45 26 - Plant Inspection Procedures
01 45 29 - Testing Laboratory Services
01 71 00 - Examination and Preparation
01 71 23 - Field Engineering
01 71 23.13 - Construction Layout
01 71 23.16 - Construction Surveying
01 78 00 - Closeout Submittals
01 78 29 - Final Site Survey
01 79 00 - Demonstration and Training
01 79 00.00.01 - Demonstration and Training
01 80 00 - Performance Requirements
01 80 00.00.01 - Performance Requirements
01 81 00 - Facility Performance Requirements
01 81 19 - Indoor Air Quality Requirements
01 82 00 - Facility Substructure Performance Requirements
01 82 13 - Foundation Performance Requirements
01 82 16 - Basement Construction Performance Requirements
01 83 00 - Facility Shell Performance Requirements
01 83 13 - Superstructure Performance Requirements
01 83 16 - Exterior Enclosure Performance Requirements
01 84 00 - Interiors Performance Requirements
01 84 16 - Stairways Performance Requirements
01 86 00 - Facility Services Performance Requirements
01 86 13 - Fire Suppression Performance Requirements
01 86 16 - Plumbing Performance Requirements
01 86 19 - HVAC Performance Requirements
01 86 23 - Integrated Automation Performance Requirements
01 86 26 - Electrical Performance Requirements
01 86 29 - Communications Performance Requirements
01 86 33 - Electronic Safety and Security Performance Requirements
01 88 00 - Other Facility Construction Performance Requirements
01 88 13 - Special Construction Performance Requirements
01 91 00 - Commissioning
01 91 13 - General Commissioning Requirements
01 91 16.13 - Foundation Commissioning
01 91 16.53 - Basement Construction Commissioning
01 91 19 - Facility Shell Commissioning
01 91 19.13 - Superstructure Commissioning
01 91 19.43 - Exterior Enclosure Commissioning
02 00 00 - Existing Conditions
02 01 00 - Maintenance of Existing Conditions
02 01 50 - Maintenance of Site Remediation
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 06 00 - Schedules for Existing Conditions
02 06 30 - Schedules for Subsurface Investigations
02 06 50 - Schedules for Site Remediation
02 06 80 - Schedules for Facility Remediation
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 08 00 - Commissioning of Existing Conditions
02 08 00.00.01 - Commissioning of Existing Conditions
02 20 00 - Assessment
02 20 00.00.01 - Assessment
02 22 00 - Existing Conditions Assessment
02 22 19 - Traffic Assessment
02 22 23 - Accessibility Assessment
02 24 00 - Environmental Assessment
02 24 13 - Natural Environment Assessment
02 24 13.13 - Air Assessment
02 24 13.73 - Land Assessment
02 24 23 - Chemical Sampling and Analysis of Soils
02 25 00 - Existing Material Assessment
02 25 16 - Existing Concrete Assessment
02 25 19 - Existing Masonry Assessment
02 25 23 - Existing Metals Assessment
02 25 23.13 - Welding Investigations
02 25 26 - Existing Wood, Plastics, and Composites Assessment
02 26 00 - Hazardous Material Assessment
02 26 23 - Asbestos Assessment
02 26 29 - Polychlorinate Biphenyl Assessment
02 26 33 - Biological Assessment
02 26 33.13 - Mold Assessment
02 26 36 - Hazardous Waste Drum Assessment
02 31 00 - Geophysical Investigations
02 31 16 - Gravity Investigations
02 31 29 - Magnetotelluric Investigations
02 32 00 - Geotechnical Investigations
02 32 16 - Material Testing
02 32 23 - Geotechnical Monitoring Before Construction
02 50 00 - Site Remediation
02 50 00.00.01 - Site Remediation
02 51 00 - Physical Decontamination
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 52 00 - Chemical Decontamination
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 00 - Thermal Decontamination
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 00 - Biological Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 55 00 - Remediation Soil Stabilization
02 55 00.00.01 - Remediation Soil Stabilization
02 56 00 - Site Containment
02 56 13 - Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 60 00 - Contaminated Site Material Removal
02 60 00.00.01 - Contaminated Site Material Removal
02 61 00 - Removal and Disposal of Contaminated Soils
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 26 - Removal and Disposal of Asbestos Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 00 - Hazardous Waste Recovery Processes
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 72 00 - Water Decontamination
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 81 00 - Transportation and Disposal of Hazardous Materials
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 82 00 - Asbestos Remediation
02 82 13 - Asbestos Abatement
02 82 13.13 - Glovebag Asbestos Abatement
02 82 13.16 - Precautions for Asbestos Abatement
02 82 13.19 - Asbestos Floor Tile and Mastic Abatement
02 82 16 - Engineering Control of Asbestos Containing Materials
02 82 33 - Removal and Disposal of Asbestos Containing Materials
02 84 00 - Polychlorinate Biphenyl Remediation
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 85 00 - Mold Remediation
02 85 13 - Precautions for Mold Remediation
02 85 16 - Mold Remediation Preparation and Containment
02 85 19 - Mold Remediation Clearance Air Sampling
02 85 33 - Removal and Disposal of Materials with Mold
02 86 00 - Hazardous Waste Drum Handling
02 86 00.00.01 - Hazardous Waste Drum Handling
04 00 00 - Masonry
04 01 00 - Maintenance of Masonry
04 01 20.93 - Testing and Sampling Brick Units for Restoration
05 00 00 - Metals
05 08 00 - Commissioning of Metals
05 08 00.00.01 - Commissioning of Metals
06 00 00 - Wood, Plastics, & Composites
06 08 00 - Commissioning of Wood, Plastics, and Composites
06 08 00.00.01 - Commissioning of Wood, Plastics, and Composites
10 00 00 - Specialties
10 08 00 - Commissioning of Specialties
10 08 00.00.01 - Commissioning of Specialties
11 00 00 - Equipment
11 08 00 - Commissioning of Equipment
11 08 00.00.01 - Commissioning of Equipment
11 92 00 - Agricultural Equipment
11 92 23 - Agricultural Waste Clean-Up Equipment
13 00 00 - Special Construction
13 08 00 - Commissioning of Special Construction
13 08 11 - Commissioning of Swimming Pools
13 08 23 - Commissioning of Planetariums
13 08 30 - Commissioning of Special Structures
21 00 00 - Fire Suppression
21 08 00 - Commissioning of Fire Suppression
21 08 00.00.01 - Commissioning of Fire Suppression
22 00 00 - Plumbing
22 08 00 - Commissioning of Plumbing
22 08 00.00.01 - Commissioning of Plumbing
23 00 00 - Heating, Ventilating, & Air Conditioning
23 01 00 - Operation and Maintenance of HVAC Systems
23 01 60.71 - Refrigerant Recovery/Recycling
23 08 00 - Commissioning of HVAC
23 08 00.00.01 - Commissioning of HVAC
25 00 00 - Integrated Automation
25 08 00 - Commissioning of Integrated Automation
25 08 00.00.01 - Commissioning of Integrated Automation
26 00 00 - Electrical
26 05 00 - Common Work Results for Electrical
26 05 73 - Overcurrent Protective Device Coordination Study
26 08 00 - Commissioning of Electrical Systems
26 08 00.00.01 - Commissioning of Electrical Systems
27 00 00 - Communications
27 08 00 - Commissioning of Communications
27 08 00.00.01 - Commissioning of Communications
28 00 00 - Electronic Safety & Security
28 08 00 - Commissioning of Electronic Safety and Security
28 08 00.00.01 - Commissioning of Electronic Safety and Security
31 00 00 - Earthwork
31 08 00 - Commissioning of Earthwork
31 08 00.00.01 - Commissioning of Earthwork
31 09 00 - Geotechnical Instrumentation and Monitoring of Earthwork
31 09 13 - Geotechnical Instrumentation and Monitoring
31 09 13.13 - Groundwater Monitoring During Construction
31 09 16 - Special Foundation and Load Bearing Elements Instrumentation and Monitoring
31 09 16.13 - Foundation Performance Instrumentation
31 09 16.26 - Bored and Augered Pile Load Tests
31 21 00 - Off-Gassing Mitigation
31 21 16 - Methane Mitigation
32 00 00 - Exterior Improvements
32 08 00 - Commissioning of Exterior Improvements
32 08 00.00.01 - Commissioning of Exterior Improvements
32 70 00 - Wetlands
32 70 00.00.01 - Wetlands
33 00 00 - Utilities
33 08 00 - Commissioning of Utilities
33 08 10 - Commissioning of Water Utilities
33 08 20 - Commissioning of Wells
33 08 30 - Commissioning of Sanitary Sewerage Utilities
33 08 40 - Commissioning of Storm Drainage Utilities
33 08 50 - Commissioning of Fuel Distribution Utilities
33 08 60 - Commissioning of Hydronic and Steam Energy Utilities
33 08 70 - Commissioning of Electrical Utilities
33 08 80 - Commissioning of Communications Utilities
34 00 00 - Transportation
34 08 00 - Commissioning of Transportation
34 08 13 - Commissioning of Roadways
34 08 23 - Commissioning of Railways
34 08 33 - Commissioning of Airfields
34 08 43 - Commissioning of Bridges
35 00 00 - Waterway & Marine Construction
35 08 00 - Commissioning of Waterway and Marine Construction
35 08 30 - Commissioning of Coastal Construction
35 08 40 - Commissioning of Waterway Construction
35 08 50 - Commissioning of Marine Construction
35 08 70 - Commissioning of Dams
40 00 00 - Process Integration
40 80 00 - Commissioning of Process Systems
40 80 00.00.01 - Commissioning of Process Systems
41 00 00 - Material Processing & Handling Equipment
41 08 00 - Commissioning of Material Processing and Handling Equipment
41 08 30 - Commissioning of Manufacturing Equipment
42 00 00 - Process Heating, Cooling, & Drying Equipment
42 08 00 - Commissioning of Process Heating, Cooling, and Drying Equipment
42 08 10 - Commissioning of Heating Equipment
42 08 20 - Commissioning of Cooling Equipment
42 08 30 - Commissioning of Drying Equipment
43 00 00 - Process Gas & Liquid Handling, Purification....
43 08 00 - Commissioning of Process Gas and Liquid Handling, Purification, and Storage Equipment
43 08 10 - Commissioning of Gas Handling Equipment
43 08 20 - Commissioning of Liquid Handling Equipment
43 08 30 - Commissioning of Gas and Liquid Purification Equipment
43 08 40 - Commissioning of Gas and Liquid Storage
44 00 00 - Pollution Control Equipment
44 08 00 - Commissioning of Pollution Control Equipment
44 08 10 - Commissioning of Air Pollution Control
44 08 40 - Commissioning Water Treatment Equipment
45 00 00 - Industry-Specific Manufacturing Equipment
45 08 00 - Commissioning of Industry-Specific Manufacturing Equipment
45 08 00.00.01 - Commissioning of Industry-Specific Manufacturing Equipment
48 00 00 - Electrical Power Generation
48 08 00 - Commissioning of Electrical Power Generation
48 08 00.00.01 - Commissioning of Electrical Power Generation