LG Tennessee Washing Machine Plant
Project Information
- Project Location:
- Clarksville, TN
- Status:
- Completed
- Structure Type:
- Manufacturing Plant
Scope Of Work
This facility was LG’s first manufacturing facility in North America and had an extremely fast paced schedule, which went from conceptual design drawings to a complete and operational manufacturing facility in less than a year. SteelFab was engaged in a design-assist role, and worked closely with the engineer of record to take conceptual design drawings to installation drawings within a matter of weeks. The structure consisted of joist framed roof and a mezzanine level over roughly 80% of the building footprint, hundreds of feet of crane runway beams, several out-buildings, and two 220’ clear-span steel framed utility bridges. The project had a complicated logistics and turn-over plan that allowed LG’s manufacturing equipment installers to work in the facility while it was still under construction.