Logo

OnSite Construction, Inc.

Share

Seaford, DE 19973

Company Info

  • Est. 2003
  • Size 1-4 Employees
  • Annual Vol Undisclosed

People Also View These
Loading...

Our Story

We are an infrastructure contractor focused on building a better future for our friends, family, co-workers, and community. We help construct roads, communities, schools, shopping centers, and parks to enjoy.

Since 2003, we have been continuously improving our operations and our approach to client satisfaction.

What We Do

Commercial Experience

Misc Project Park / Playground Retail Store
Apartments & Condominiums Auto Dealership / Service Bank Church / Synagogue Fitness Center Grocery Stores Hospital / Nursing Home Hotel / Motel House Office Building Residential Building Restaurant Single Family Residential

Regions & Counties Serviced

  • Washington D.C.
  • Pennsylvania-Eastern

Delaware 1

  • Sussex

Our CSI Codes

01 89 13 - Site Preparation Performance Requirements
01 89 16 - Site Improvements Performance Requirements
01 89 19 - Site Plumbing Utilities Performance Requirements
01 89 23 - Site HVAC Utilities Performance Requirements
01 89 26 - Site Electrical Utilities Performance Requirements
01 89 29 - Other Site Construction Performance Requirements
02 32 19 - Exploratory Excavations
02 58 16 - Snow Avalanche Control
22 13 23 - Sanitary Waste Interceptors
22 13 26 - Sanitary Waste Separators
22 13 29.33 - Sewerage Pump Basins and Pits
22 13 36 - Packaged, Wastewater Pump Units
22 13 43 - Facility Packaged Sewage Pumping Stations
22 13 43.13 - Facility Dry-Well Packaged Sewage Pumping Stations
22 13 43.16 - Facility Wet-Well Packaged Sewage Pumping Stations
22 14 29.19 - Sump-Pump Basins and Pits
23 22 13.13 - Underground Steam and Condensate Heating Piping
26 05 43 - Underground Ducts and Raceways for Electrical Systems
31 06 20.13 - Trench Dimension Schedule
31 10 00.00.01 - Site Clearing
31 14 13.23 - Topsoil Stripping and Stockpiling
31 21 16.13 - Methane Venting
31 23 13 - Subgrade Preparation
31 30 00.00.01 - Earthwork Methods
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.62 - Concrete Paving Raising
32 01 30 - Operation and Maintenance of Site Improvements
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 06 30 - Schedules for Site Improvements
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 12 13.23 - Asphaltic Prime Coats
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
32 30 00.00.01 - Site Improvements
32 71 00.00.01 - Constructed Wetlands
32 72 00.00.01 - Wetlands Restoration
33 01 10 - Operation and Maintenance of Water Utilities
33 01 60 - Operation and Maintenance of Hydronic and Steam Energy Utilities
33 01 70 - Operation and Maintenance of Electrical Utilities
33 01 80 - Operation and Maintenance of Communications Utilities
33 06 10 - Schedules for Water Utilities
33 06 40 - Schedules for Storm Drainage Utilities
33 06 60 - Schedules for Hydronic and Steam Energy Utilities
33 06 70 - Schedules for Electrical Utilities
33 09 10 - Instrumentation and Control for Water Utilities
33 09 40 - Instrumentation and Control for Storm Drainage Utilities
33 09 60 - Instrumentation and Control for Hydronic and Steam Energy Utilities
33 09 70 - Instrumentation and Control for Electrical Utilities
33 10 00.00.01 - Water Utilities
33 11 13 - Public Water Utility Distribution Piping
33 11 16 - Site Water Utility Distribution Piping
33 12 23 - Water Utility Pumping Stations
33 29 00.00.01 - Well Abandonment
33 32 13 - Packaged Utility Lift Stations
33 32 13.13 - Packaged Sewage Lift Stations, Wet Well Type
33 32 16 - Packaged Utility Wastewater Pumping Stations
33 32 16.13 - Packaged Sewage Grinder Pumping Units
33 32 19 - Public Utility Wastewater Pumping Stations
33 33 13 - Sanitary Utility Sewerage
33 33 16 - Combined Utility Sewerage
33 34 13 - Sanitary Utility Sewerage Inverted Siphons
33 41 13 - Public Storm Utility Drainage Piping
33 47 16.13 - Pond Covers
33 47 16.53 - Reservoir Covers
33 47 19.13 - Water Distribution Ponds
33 47 19.16 - Water Retainage Reservoirs
33 47 19.23 - Cooling Water Ponds
33 47 19.33 - Fire-Protection Water Ponds
33 47 23 - Sanitary Sewerage Lagoons
33 47 26 - Storm Drainage Ponds and Reservoirs
33 47 26.13 - Stabilization Ponds
33 47 26.16 - Retention Basins
33 47 26.19 - Leaching Pits
33 50 00.00.01 - Fuel Distribution Utilities
33 51 13 - Natural-Gas Piping
33 60 00.00.01 - Hydronic and Steam Energy Utilities
33 61 13 - Underground Hydronic Energy Distribution
33 61 23 - Aboveground Hydronic Energy Distribution
33 63 13 - Underground Steam and Condensate Distribution Piping
33 70 00.00.01 - Electrical Utilities
33 71 19 - Electrical Underground Ducts and Manholes
33 71 39.23 - Underground High-Voltage Wiring
33 71 49.23 - Underground Medium-Voltage Wiring
33 79 19 - Utilities Grounding
33 79 19.13 - Electrical Utilities Grounding
33 79 19.16 - Communications Utilities Grounding
34 01 33 - Operation and Maintenance of Airfields
34 05 33 - Common Work Results for Airports
34 06 33 - Schedules for Airfields
35 73 13 - Earth Embankment Dam
40 23 36 - Sanitary Water Process Piping
41 14 16 - Batch Cars/Transports
41 14 19 - Batch Hoppers
44 41 13 - Packaged Water Treatment Plants
44 41 13.13 - Chemical Packaged Water Treatment Plants
44 41 13.16 - Biological Packaged Water Treatment Plants
44 41 13.19 - Thermal Packaged Water Treatment Plants
44 46 26 - Sludge Thickeners

Project Experience

  • Non-Union
  • Public
  • Private
  • New Projects
  • Service Work/Repairs
  • Projects From $2,000,000 and above

Gallery

Featured Image 1
Kew Gardens
Featured Image 2
Kew Gardens
Featured Image 3
Proximity Malt
Featured Image 4
Proximity Malt
Service Area and Locations Map for OnSite Construction, Inc.
Share URL copied!
https://www.thebluebook.com/iProView/1007336/onsite-construction-inc/subcontractors/
Facebook
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.