Hinkle Contracting Co. LLC

Paris, KY 40361

Company Info

  • Annual Vol Not Provided

People Also View These
Loading...

Our Story

Our main lines of business include: Aggregates--Lightweight, Ready Mixed Concrete, Paving Materials.

Hinkle Contracting Co. LLC has been listed in the Blue Book since 2010.

What We Do

  • Aggregates--Lightweight
  • Paving Materials
  • Ready Mixed Concrete

Regions & Counties Serviced

  • Indiana - Indianapolis and Vicinity

Kentucky 1

  • Bourbon

Our CSI Codes

02 01 50 - Maintenance of Site Remediation
02 01 65 - Maintenance of Underground Storage Tank Removal
02 01 86 - Maintenance of Hazardous Waste Drum Handling
02 06 50 - Schedules for Site Remediation
02 06 65 - Schedules for Underground Storage Tank Removal
02 06 86 - Schedules for Hazardous Waste Drum Handling
02 26 36 - Hazardous Waste Drum Assessment
02 41 13.33 - Railtrack Removal
02 50 00.00.01 - Site Remediation
02 51 13 - Coagulation and Flocculation Decontamination
02 51 16 - Reverse-Osmosis Decontamination
02 51 19 - Solidification and Stabilization Decontamination
02 51 23 - Mechanical Filtration Decontamination
02 51 26 - Radioactive Decontamination
02 52 13 - Chemical Precipitation Decontamination
02 52 16 - Ion Change Decontamination
02 52 19 - Neutralization Decontamination
02 53 16 - Thermal Desorption Decontamination
02 53 16.13 - Remediation of Contaminated Soils by Thermal Desorption
02 53 19 - Vitrification Decontamination
02 54 19 - Bioremediation Decontamination
02 54 19.13 - Bioremediation Using Landfarming
02 54 19.16 - Bioremediation of Soils Using Windrow Composting
02 54 19.19 - Bioremediation Using Bacteria Injection
02 54 23 - Soil Washing through Separation/Solubilization
02 54 26 - Organic Decontamination
02 55 00.00.01 - Remediation Soil Stabilization
02 56 13 - Waste Containment
02 56 19 - Gas Containment
02 56 19.13 - Fluid-Applied Gas Barrier
02 60 00.00.01 - Contaminated Site Material Removal
02 61 13 - Excavation and Handling of Contaminated Material
02 61 23 - Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
02 61 29 - Removal and Disposal of Organically Contaminated Soils
02 62 13 - Air and Steam Stripping
02 62 16 - Soil Vapor Extraction
02 62 19 - Soil Washing and Flushing
02 72 13 - Chemical Water Decontamination
02 72 16 - Biological Water Decontamination
02 72 19 - Electrolysis Water Decontamination
02 81 00.00.01 - Transportation and Disposal of Hazardous Materials
02 84 16 - Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
02 84 33 - Removal and Disposal of Polychlorinate Biphenyls
02 86 00.00.01 - Hazardous Waste Drum Handling
03 01 20 - Maintenance of Concrete Reinforcing
03 01 30 - Maintenance of Cast-in-Place Concrete
03 06 20 - Schedules for Concrete Reinforcing
03 06 20.13 - Concrete Beam Reinforcing Schedule
03 06 20.16 - Concrete Slab Reinforcing Schedule
03 06 30 - Schedules for Cast-in-Place Concrete
03 06 30.13 - Concrete Footing Schedule
03 06 30.16 - Concrete Column Schedule
03 06 30.19 - Concrete Slab Schedule
03 06 30.26 - Concrete Beam Schedule
03 30 53 - Miscellaneous Cast-in-Place Concrete
03 31 13 - Heavyweight Structural Concrete
03 31 23 - High-Performance Structural Concrete
11 92 23 - Agricultural Waste Clean-Up Equipment
23 01 60.71 - Refrigerant Recovery/Recycling
31 24 13 - Roadway Embankments
31 24 16 - Railway Embankments
31 32 13 - Soil Mixing Stabilization
31 32 13.13 - Asphalt Soil Stabilization
31 32 13.16 - Cement Soil Stabilization
31 32 13.19 - Lime Soil Stabilization
31 32 13.23 - Fly-Ash Soil Stabilization
31 32 13.26 - Lime-Fly-Ash Soil Stabilization
31 32 16 - Chemical Treatment Soil Stabilization
31 32 16.13 - Polymer Emulsion Soil Stabilization
31 32 19 - Geosynthetic Soil Stabilization and Layer Separation
31 32 19.13 - Geogrid Soil Stabilization
31 32 19.16 - Geotextile Soil Stabilization
31 32 33 - Shotcrete Soil Slope Stabilization
31 33 23 - Rock Slope Netting
31 33 26 - Rock Slope Wire Mesh
31 33 43 - Vegetated Rock Slope Stabilization
31 35 19 - Geosynthetic Slope Protection
31 35 19.13 - Geogrid Slope Protection
31 35 19.16 - Geotextile Slope Protection
31 35 19.19 - Slope Protection with Mulch Control Netting
31 35 23 - Slope Protection with Slope Paving
31 35 23.13 - Cast-In-Place Concrete Slope Paving
31 35 26 - Containment Barriers
31 35 26.13 - Clay Containment Barriers
31 35 26.16 - Geomembrane Containment Barriers
31 35 26.23 - Bentonite Slurry Trench
31 63 33 - Drilled Micropiles
31 72 13 - Rock Reinforcement and Initial Support
32 01 17.62 - Stress-Absorbing Membrane Interlayer
32 01 23 - Base Course Reconditioning
32 01 26 - Rigid Paving Rehabilitation
32 01 26.74 - Concrete Overlays
32 01 29 - Rigid Paving Repair
32 01 29.62 - Concrete Paving Raising
32 06 10 - Schedules for Bases, Ballasts, and Paving
32 06 10.13 - Pedestrian Walkway Schedule
32 11 13 - Subgrade Modifications
32 11 13.13 - Lime-Treated Subgrades
32 11 13.16 - Bituminous-Treated Subgrades
32 11 33 - Cement-Treated Base Courses
32 12 13.23 - Asphaltic Prime Coats
32 12 16.13 - Plant-Mix Asphalt Paving
32 12 16.16 - Road-Mix Asphalt Paving
32 12 16.19 - Cold-Mix Asphalt Paving
32 12 16.23 - Reinforced Asphalt Paving
32 12 16.26 - Fiber-Modified Asphalt Paving
32 12 16.29 - Polymer-Modified Asphalt Paving
32 12 16.33 - Granulated Rubber-Modified Asphalt Paving
32 13 13 - Concrete Paving
32 13 13.13 - Exposed Aggregate Concrete Paving
32 13 13.16 - Power-Compacted Concrete Paving
32 13 13.19 - Prestressed Concrete Paving
32 13 16.13 - Patterned Concrete Paving
32 13 16.16 - Roller-Compacted Concrete Paving
32 13 16.19 - Imprinted Concrete Paving
32 13 16.23 - Stamped Concrete Paving
32 32 34 - Reinforced Soil Retaining Walls
32 91 16 - Planting Soil Stabilization
32 91 16.13 - Blanket Planting Soil Stabilization
32 91 16.16 - Mat Planting Soil Stabilization
32 91 16.19 - Netting Planting Soil Stabilization
33 01 50 - Operation and Maintenance of Fuel Distribution Lines
33 01 50.51 - Cleaning Fuel-Storage Tanks
34 01 23 - Operation and Maintenance of Railways
34 01 23.13 - Track Removal and Salvage
34 01 23.81 - Track Crosstie Replacement
34 01 33 - Operation and Maintenance of Airfields
34 05 23 - Common Work Results for Railways
34 05 33 - Common Work Results for Airports
34 06 23 - Schedules for Railways
34 06 33 - Schedules for Airfields
34 10 00.00.01 - Guideways/Railways
34 11 13 - Track Rails
34 11 13.13 - Light Rail Track
34 11 13.23 - Heavy Rail Track
34 11 16 - Welded Track Rails
34 11 16.13 - In-Track Butt-Welded Track Rail
34 11 16.16 - Pressure-Welded Track Rail
34 11 16.19 - Thermite-Welded Track Rail
34 11 19 - Track Rail Joints
34 11 23 - Special Trackwork
34 11 23.13 - Ballasted Special Track Rail
34 11 23.23 - Running Rail
34 11 23.26 - Precurved Running Rail
34 11 26 - Ballasted Track Rail
34 11 29 - Embedded Track Rail
34 12 13 - Elevated Monorails
34 12 16 - On-Grade Monorails
34 12 19 - Below-Grade Monorails
34 12 63 - Monorail Track
34 13 13 - Inclined Railway
34 14 19 - Gondolas
34 14 53 - Cable Car Systems
34 70 00.00.01 - Transportation Construction and Equipment
35 01 70 - Operation and Maintenance of Dams
35 05 70 - Common Work Results for Dams
35 06 70 - Schedules for Dams
35 41 13 - Landside Levee Berms
35 41 13.13 - Stability Landside Levee Berms
35 41 13.16 - Seepage Landside Levee Berms
35 42 35 - Slope Protection Bank Protection
35 43 35 - Slope Protection Scour Protection
35 49 13 - Floodwalls
35 49 13.13 - Concrete Floodwalls
35 70 00.00.01 - Dam Construction and Equipment
35 71 13 - Concrete Gravity Dams
35 71 16 - Masonry Gravity Dams
35 72 13 - Concrete Arch Dams
35 74 13 - Concrete Buttress Dams
41 33 23 - Drilling Equipment
41 66 13 - Mobile Boring and Drilling Rigs
45 11 01 - Operation and Maintenance of Oil and Gas Extraction Equipment
45 11 06 - Schedules for Oil and Gas Extraction Equipment

Gallery

Featured Image 1
We are located in Bourbon County.
Share URL copied!
https://www.thebluebook.com/iProView/1072971/hinkle-contracting-co-llc/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.