G
Featured Project Return to Projects List
Step Feed Phase II
Project Information
- Project Location:
- Akron, OH
- Status:
- In-Progress
- Structure Type:
- Sewage / Water Treatment Plant
References
- Owner:
- City of Akron
Scope Of Work
The City of Akron intends to upgrade the WRF to achieve a minimum secondary treatment capacity of 170 million gallons per day (“MGD”), including:
Modify the final settling tanks for secondary treatment trains 1 through 4 to include a step feed mode
Refurbish 18 circular final settling tanks with new sludge collection equipment
Construction of new hydraulic conduits and scum channels.
Refurbish 6 secondary aeration basins with new gates, piping and diffuser systems
Refurbish RAS screw pumping station pumps and buildings
Replace existing process water valves and flow meters
Refurbish HVAC, electrical, lighting, and replace roof on Aeration Gallery