Franks Creek Bridge
Project Information
- Project Location:
- OR
- Status:
- Completed
- Structure Type:
- Bridge
Scope Of Work
Deschutes Concrete Construction was hired as the general contractor by the BLM to replace this bridges superstructure. The bridge crosses the John Day River near Dayville, OR. In order to allow traffic to still cross the river, Deschutes installed 7 60" culverts in the river and built a road over them. Then the existing superstructure could be removed and replaced with new pre-stressed concrete girders. After the new bridge was installed the culverts were removed. All this was done in a small work window from July to September so as not to disturb migrating salmon in the river.