Logo

Deschutes Construction Corp.

Redmond, OR 97756

Company Info

  • Est. 2005
  • Size 20-49 Employees
  • Annual Vol Undisclosed

Featured Project Return to Projects List

Franks Creek Bridge

Project Information

Project Location:
OR
Status:
Completed
Structure Type:
Bridge

Scope Of Work

Deschutes Concrete Construction was hired as the general contractor by the BLM to replace this bridges superstructure. The bridge crosses the John Day River near Dayville, OR. In order to allow traffic to still cross the river, Deschutes installed 7 60" culverts in the river and built a road over them. Then the existing superstructure could be removed and replaced with new pre-stressed concrete girders. After the new bridge was installed the culverts were removed. All this was done in a small work window from July to September so as not to disturb migrating salmon in the river.

Project Images

#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/1112478/deschutes-construction-corp/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.